Your Directors’ are pleased to present the Thirty Eighth Directors’ Report of the Company for the year ended 31st March, 2026 along with the Audited Statement of Accounts, Report of Auditors and Comments of the Comptroller and Auditor General of India.
The following financial highlights for the year ended 31st March 2026 briefly encapsulate the performance of your company: -
1. FINANCIAL HIGHLIGHTS (' in crore)
|
PARTICULARS
|
Standalone
|
Consolidated
|
|
2025-26 | 2024-25
|
2025-26 2024-25
|
|
REVENUE
|
|
Revenue from Operations
|
3,544.52
|
2,897.25
|
4,528.29
|
3,072.01
|
|
Other Income
|
325.14
|
355.19
|
194.52
|
304.49
|
|
Total Revenue
|
3,869.66
|
3,252.44
|
4,722.81
|
3,376.50
|
|
EXPENSES
|
|
Fuel Cost
|
-
|
-
|
286.79
|
-
|
|
Purchase of Electricity for Trading
|
0.95
|
75.16
|
0.95
|
75.16
|
|
Employee Benefits Expense
|
299.31
|
304.61
|
312.93
|
304.88
|
|
Finance Costs
|
910.36
|
726.48
|
1,297.86
|
743.37
|
|
Depreciation, Amortisation & Impairment Expense
|
631.84
|
454.49
|
1,041.98
|
676.21
|
|
Other Expenses
|
397.35
|
395.60
|
578.03
|
470.89
|
|
Total Expenses
|
2,239.81
|
1,956.34
|
3,518.54
|
2,270.51
|
|
Profit before exceptional items, net movement in regulatory deferral account balance and tax
|
1,629.85
|
1,296.10
|
1,204.27
|
1,105.99
|
|
Exceptional items
|
-
|
-
|
-
|
-
|
|
Profit before share in net profit of Joint Venture/associates, net movement in reg -ulatory deferral account balance and tax
|
1,629.85
|
1,296.10
|
1,204.27
|
1,105.99
|
|
Share in Profit (Loss) of Joint Venture/ Associates
|
-
|
-
|
(3.64)
|
5.70
|
|
Profit before net movement in regulatory deferral account balance and tax
|
1,629.85
|
1,296.10
|
1,200.63
|
1,111.69
|
|
Tax Expenses:
|
|
|
|
|
|
- Current Tax
|
345.73
|
226.46
|
345.75
|
226.80
|
|
- Tax expense pertaining to earlier years
|
-
|
-
|
-
|
(125)
|
|
- Deferred Tax
|
222.96
|
86.65
|
159.77
|
55.31
|
|
Profit before regulatory deferral account balances
|
1,061.16
|
982.99
|
695.11
|
830.83
|
|
Net movement in regulatory deferral account balances (net of tax)
|
(53.26)
|
(12.81)
|
(53.26)
|
(12.81)
|
|
Profit for the year
|
1,007.90
|
970.18
|
641.85
|
818.02
|
|
Other comprehensive Income/(Expense) (Net of tax)
|
(8.05)
|
(10.99)
|
(8.14)
|
(11.03)
|
|
Total Comprehensive Income for the year
|
999.85
|
959.19
|
633.71
|
806.99
|
2. GENERATION
Gross Energy Generation from various operational power plants of the Company, including subsidiaries during FY 2025-26 is as under :-
(Million Units (MU)
|
Name of Power Station
|
Design Energy
|
FY 2025-26
|
FY 2024-25
|
|
1500 MW Nathpa Jhakri HPS
|
6612
|
7506.617
|
7421.453
|
|
412 MW Rampur HPS
|
1878.08
|
2108.034
|
2073.997
|
|
60 MW Natwair Mori HPS
|
265.5
|
310.366
|
316.410
|
|
Total Hydro Generation
|
|
9925.017
|
9811.86
|
|
47.6 MW Khirvire WPS
|
85.65
|
46.745
|
46.239
|
|
50 MW Sadla WPS
|
120.05
|
79.024
|
89.375
|
|
Total Wind Generation
|
|
125.769
|
135.614
|
|
5.6 MW Charanka SPS
|
7.5271
|
6.836
|
8.760
|
|
1.3 MW Wadhal SPS
|
1.5
|
1.132
|
1.260
|
|
Total solar generation
|
|
7.968
|
10.02
|
|
Total generation from SJVN’s Power Stations
|
10058.754
|
9957.494
|
|
Generation from SGEL’s Power Stations
|
|
75 MW Parasan SPS
|
168.192
|
136.619
|
152.95
|
|
75 MW Gurhah SPS
|
159.125
|
146.528
|
150.63
|
|
50 MW Gujrai SPS
|
105.996
|
92.423
|
96.47
|
|
100 MW Raghanesda SPS
|
252.280
|
233.983
|
198.50
|
|
90 MW Omkareshwar SPS
|
194
|
174.578
|
90.49
|
|
1000 MW Bikaner SPS$
|
2452.800
|
1055.230
|
-
|
|
70 MW Dhubri SPS*
|
141.130
|
16.016
|
-
|
|
Total generation from SGEL’s Power Stations
|
1855.377
|
689.04
|
|
Generation from STPL’s Power Station
|
|
1320 MW Buxar TPS#
|
9828
|
1388.259
|
-
|
|
Total STPL Generation
|
1388.259
|
-
|
|
Gross energy generation from various operational plants of the company, including subsidiaries.
|
13302.390
|
10646.534
|
|
$ Bikaner Solar Power Station fully commissioned on 24.12.2025.
|
|
*70 MW Dhubri Solar Power Station commissioned on 05.02.2026
|
|
#One unit (660 MW) of Buxar Thermal Power Plant commissioned on 14.11.2025.
|
Generation Records & Milestones achieved during FY 2025-26 include :-
• Record Power Generation
SJVN achieved its highest-ever annual generation of 13,302 million units (MU) from all operational power stations (including subsidiaries) during FY 2025-26, setting a new benchmark in energy generation.
• Nathpa Jhakri Hydro Power Station (1500 MW)
o Recorded its second-highest gross annual generation since commissioning with 7,506.617 MU.
o Achieved a significant milestone by crossing 150 billion units of cumulative gross generation in March 2026.
o Registered highest gross monthly generation of 1,123.135 MU in July 2025. o Achieved design energy (6,612 MU) on 29.11.2025, 122 days ahead of schedule. o NJHPS achieved a Plant Availability Factor (PAF) of 96.837% during FY 2025-26 against the normative PAF of 87%.
• Rampur Hydro Power Station (412 MW)
o Achieved highest-ever annual generation of 2,108.034 MU, surpassing the previous record of 2,098.031 MU (FY 2019-20). o First time crossing the 2,100 MU mark in its operational history. o Achieved design energy (1,878.08 MU) on 08.12.2025, 113 days ahead of schedule. o Recorded highest monthly generation of 309.547 MU in July 2025. o Achieved highest-ever Q3 generation of 333.835 MU, exceeding the previous best of 322.950 MU (FY 2021-22).
o Registered highest-ever November generation of 95.313 MU, surpassing 91.232 MU (November 2021).
o RHPS achieved a Plant Availability Factor (PAF) of 97.285 % during FY 2025-26 against the normative PAF of 83%.
• Naitwar Mori Hydro Power Station (60 MW)
o Achieved design energy (265.5 MU) on 29.11.2025, 122 days ahead of schedule. o Generated 310.366 MU during FY 2025-26 (2nd year of O&M). o Generation exceeded design energy by 44.86 MU (17% higher), reflecting strong operational performance.
• Solar Power Developments
o 1,000 MW Bikaner Solar Power Station (SPS) achieved full capacity commissioning on
24.12.2025.
o Bikaner SPS Achieved 1 billion units of cumulative generation on 19.03.2026. o 70 MW Dhubri Solar Power Plant (Assam) commissioned on 05.02.2026.
• Thermal Power Development
o One unit (660 MW) of the Buxar Thermal Power Project commissioned on 14 November 2025.
3. REVENUE AND PROFITS
The standalone revenue from operation increased by '647.27 crore to '3,544.52 crore during the financial year 2025-26 compared to '2,897.25 crore during the previous year. The standalone Profit After Tax (PAT) increased by '37.72 crore to '1,007.90 crore against '970.18 crore for the previous year.
The Company has five subsidiary companies, of which four are wholly owned subsidiaries. Three subsidiaries are presently in the construction phase. The remaining two subsidiaries, namely SJVN Green Energy Limited (SGEL) and SJVN Thermal Private Limited, are in the operational stage. SGEL has seven operational renewable energy projects with an aggregate installed capacity of 1,460 MW, while one unit of 660 MW of the 1,320 MW Buxar Thermal Power Project in Bihar being developed by SJVN Thermal Private Limited commenced commercial operation during the third quarter of FY 2025-26. The company has one joint venture entity, CPTC Limited which is in operation stage. Consolidation has resulted in decrease in profit of consolidated group by '366.05 crore (P.Y. decrease of '152.16 crore) as compared to standalone financial statements mainly due to losses in Subsidiary Companies and Joint Venture Company.
4. TRANSFER TO RESERVES
During the year '7,101.83 crore (P.Y.- Nil) was transferred to General Reserve of the Company.
5. DIVIDEND
During the year, an interim dividend of '1.15 per share has been declared in the month of February 2026. In addition, your Board has recommended a final dividend of '0.35/- per Share. Thus, subject to your approval, a total dividend of '1.50 per share ('589.47 crore) is proposed to be paid for FY 2025-26 against '1.46 per share ('573.75 crore) paid during the previous year.
6. PROGRESS OF PROJECTS (HYDRO, THERMAL & SJVN RENEWABLE PROJECTS)
The progress of the projects of the Company and its subsidiaries are as follows: -
A) PROJECTS UNDER CONSTRUCTION1) Arun-3 HEP (900 MW):
Arun-3 Hydro Electric Project (4 x 225 MW) is located on River Arun in District Sankhuwasabha of Eastern Nepal. The Project is run-of-the-river scheme with 4 hours peaking and is designed to generate 3924 MU energy annually in a 90% dependable year. SJVN bagged the Project through International Competitive Bidding. Memorandum of Understanding for the execution of this Project was signed with Government of Nepal (GoN) on 02.03.2008. The Project was allotted to SJVN on BOOT basis, to be operated by SJVN for 25 years after the commissioning and thereafter it will be handed over to the Government of Nepal. SJVN Arun-3 Power Development Company Pvt. Ltd (SAPDC) was registered on 25.04.2013 under Companies Act of Nepal, 2063 with an aim to plan, promote and execute the Project.
Techno-Economic approval of the Project was accorded by CEA, Government of India (Gol) on 09.06.2014. Project Development Agreement (PDA) was signed with Investment Board of Nepal (IBN), GoN on 25.11.2014. Financial Closure was achieved on 06.02.2020 for 6,333.48 Crores through consortium of five Indian and two Nepalese banks with SBI as the lead.
Environment Impact Assessment report of the Project was approved by Ministry of Science, Technology & Environment, GoN on 12.08.2015. Private land required for the Project has been registered in the name of SAPDC. Lease agreement for diversion of 96.97 ha forest land was signed on 23.08.2017 and for balance 26.25 ha land lease agreement was signed on 06.02.2018.
Government of India has accorded investment approval for the Generation component of the Project at an estimated cost of 5,723.72 Crores at May, 2015 price level. Government of Nepal has issued Generation license on 04.05.2018.
Hon’ble Prime Ministers of India and Nepal jointly laid the foundation stone of this Project on
11.05.2018. Major works of the Project are divided into four main packages which have already been awarded and the progress of works is discussed as under.
Civil works:
C1 Package comprising Civil Works in Dam complex area and 3.7 km Head Race Tunnel (HRT) was awarded to M/s Jaiprakash Associates Ltd. on 22.09.2017. Work is in progress at all the fronts. Diversion of River was completed on 01.02.2021. Intake works and HRT works have been completed. Dam concreting is in progress and 49% concreting has been completed till date.
C2 Package comprising Civil Works in Power House and 8.1 km Head Race Tunnel (HRT) was awarded on 19.03.2018 to M/s Patel Engineering Ltd. All access adits to HRT, Power House, Pressure Shafts, Machine Hall, Transformer Hall and Butterfly Valve House have been completed. Excavation of Machine Hall, Transformer Hall, Butterfly Valve House, Collection Gallery and Head Race Tunnel has also been completed. Excavation and concrete lining of Surge Shaft is complete. Lining of Head Race Tunnel, Grouting of Surge Shaft and excavation of TRT Outfall is in Progress.
HM works:
HM Package- was awarded to M/s OM Infra Ltd. on 11.04.2018. Fabrication of major components has been completed. Supply and erection of Draft Tube Gates, Bulkhead for Main Intake Gate, Main Intake Gates and Intake Trash Rack Panels has been completed. Supply of other major components has been completed.
Pressure Shaft Steel Liner (PS-1 & PS-2): Work of Pressure Shaft steel liners was awarded to M/S TEXMACO-SSFMPL(JV) on 27.07.2023. Approx. 96% of total Steel plates have been supplied. Erection of Pressure Shaft ferrules is in progress and 38% ferrules have been erected.
EM works:
EM Package was awarded to M/s BHEL on 30.04.2018. Design and drawings of all major EM components have been approved and fabrication and supply of components is in progress. Unit-1, Unit -2 and Unit-3 Pit-free has been achieved and Barrel Concreting of Unit-4 has been completed on 30.03.2026. Rotor & stator assembly of Unit-1 & 2 has been completed. Supply of all other major components is in progress.
Construction Power: Construction of 33 kV Transmission Line (46 km) for construction Power has been completed, line charged and construction power made available at site.
Power Evacuation System of Arun-3 HEP: Power Evacuation system consists of 253 km long 400 kV DC Transmission Line from Diding (Project area) in Nepal through Dhalkebar to Sitamarhi Substation, India. Nepal portion of 217 km from Arun-3 Power House (Diding) to Bathnaha (Nepal Border) is being constructed by SAPDC. Government of India accorded investment approval amounting to 1,236.13 Crores at June, 2017 price level on 08.03.2019 for the Nepal portion of Transmission Line to be constructed by SAPDC. Government of Nepal has issued Transmission license on 12.02.2019.
Indian portion of Transmission Line from Bathnaha-Sitamarhi has been completed by PGCIL and charging upto border area as anti-theft measure has also been done.
MoU has been signed with PGCIL for Project Management consultancy for execution of Transmission Line stretch in Nepal. Construction work is being carried out through five packages. 77% Tower foundations & 68% erection of Towers have been completed and balance work is in progress. Conductor stringing in 77.6 km out of 217 km has been completed.
2) Buxar Thermal Power Project (1320 MW):
MOU was signed between SJVN, Bihar State Power Holding Company Limited and Bihar Power Infrastructure Company for the development of 1320 MW Thermal Power Project at village Chausa in District Buxar of Bihar on 17.01.2013. SJVN acquired the Project executing Company Buxar Bijlee Company Private Limited on 04.07.2013. The name of Buxar Bijlee Company Private Limited was changed to SJVN Thermal Private Limited (STPL), a wholly owned subsidiary company of SJVN Limited on 17.10.2013.
Investment approval for carrying out pre-construction activities of the Project amounting to 436.68 Crores was accorded by GoI on 26.05.2015. MoEF&CC accorded Environment Clearance on 28.02.2017. 1058.33-acre private land for Project components was transferred in the name of STPL on 12.12.2017. Consent to Establish (NOC) was granted by Bihar State Pollution Control Board on 03.09.2019.
CCEA accorded investment approval of Main Plant works on 08.03.2019, amounting to Rs.10,439.09 Crores. Foundation stone for the Project was laid by Hon’ble Prime Minister of India on 09.03.2019.
Main Plant works were awarded to M/s Larsen & Toubro Ltd. on 22.06.2019. Hon’ble Prime Minister Shri Narendra Modi inaugurated the Unit-1 on 22.08.2025. COD of Unit-1 of Buxar TPP (660 MW) has been declared on 14.11.2025 and works for Unit-2 are under progress. As on date, the project has achieved 95% physical progress. Major construction milestones for Unit-2 i.e. Hydro test & Steam Blowing for Boiler-2, Boxing-up of STG-2, readiness of ESP-2, Chimney works etc have been completed and Unit-2 has been Synchronization with National Grid on 08.05.2026. Commissioning is under progress.
Coal arrangement: Long-term coal linkage has been tied up through CCL and Fuel Supply Agreement (FSA) has been signed. For coal transportation, land acquisition for the original railway corridor faced resistance and is under adjudication in LARRA Court. An alternate coal transportation arrangement has been devised. Under alternate coal logistics, MoU with ECR
(Danapur) was signed for construction of Multi modal Gati Shakti Cargo terminal and work of Phase-I has been completed on 24.04.2025. Work of Phase-II of Gati Shakti Cargo Terminal was awarded to M/s RVNL and same has been completed.
Water Corridor: Approval for alternate water arrangement has been received from Water Resource Department and Lease agreement for 35 years signed with Irrigation Deptt., GoB. Pipe laying work has been completed and filling of raw water reservoir started w.e.f.
22.07.2025.
Power Evacuation: Power Purchase Agreement (PPA) for the Project was signed with Bihar State Electricity Board (later Bihar State Power Holding Company Limited, BSPHCL) for 85% share of Power at bus bar rate. PPA (supplementary agreement) signed with BSPHCL on 09.04.2021 for construction of Transmission Lines for Power evacuation. Transmission line works have been completed in all respects and Buxar-Naubatpur Line (400kV), 20KV Karmnasha Line#2, GIS 400 kV as well as 220 kV charged.
Unit-2 is anticipated to be commissioned in FY 2026-27.
3) Luhri HEP Stage-1 (210 MW):
Luhri Hydro Electric Project Stage-1 is a Run-of-the-River (RoR) scheme with installed capacity of 210 MW, located on river Satluj, near village Nirath spread over Shimla and Kullu Districts of Himachal Pradesh. The project will generate 758 MU of electric energy in a 90% dependable year. MOU for execution of the project was signed with Govt. of Himachal Pradesh on 25.09.2019.
Investment approval amounting to Rs. 1810.56 Cr for main works accorded on 20.11.2020 with completion period of 62 months from date of investment approval. Foundation stone laid by Hon’ble Prime Minister on 27.12.2021. Financial closure of the project has been achieved on 28.02.2022 and agreement signed with State Bank of India.
Main Civil & HM works package was awarded on 24.11.2020 to M/s Luhri Hydro Power Consortium. Permanent steel truss bridge (84m) to cross river has been commissioned. River was diverted on 25.06.2022. 91% Dam excavation completed so far. Excavation of power house up to pit for 3 units out 4 has been completed. Concreting of columns and beams in Service Bay has been completed and 1st stage concreting for Unit-1 & 2 was in progress. Work at all major fronts i.e. Dam and Power house were held up since 18.05.2024 due to overtopping of coffer dam and cavity formed in diversion tunnel on 10.06.2024. After completing the rectification works of Diversion Tunnel, the river has been diverted on
06.02.2026. Re-construction of Coffer dam has been completed and slope stabilization works are under progress.
EM package was awarded to M/s Voith Hydro Pvt. Ltd. on 16.07.2021. Manufacturing of all four draft tube liners has been completed and delivered at site. EOT crane, Stator bars, pit liners, rotor poles and rotor hub for all units have also been received at site. Manufacturing of spiral case and other EM components is in progress.
Power from the project shall be evacuated from 400/ 220 kV common pooling station proposed to be constructed at Village Ogli by CTU. Accordingly, work for construction of 220 kV transmission line from switchyard to common pooling station (ISTS network) awarded on
06.07.2022. Forest clearance Stage-1 accorded by MOEF&CC on 27.05.2025 and approval for execution of work in Forest land has been received on 25.02.2026. Proposal for private land compensation and RoW for transmission line has been approved. Foundation work for 1st tower in project area has been completed.
4) Dhaulasidh HEP (69.5 MW):
Dhaulasidh Hydro Electric Project with installed capacity of 69.5 MW (66 + 3.5 MW) is located on river Beas, in Hamirpur and Kangra districts of Himachal Pradesh. The Project is a run-of- the-river scheme and will generate 325 MU of electric energy in a 90% dependable year. MOU was signed with Govt. of Himachal Pradesh on 25.09.2019.
Investment approval amounting to Rs. 687.97 Cr for main works accorded on 01.10.2020 with completion period of 54 months from date of commencement of construction works. Foundation stone laid by Hon’ble Prime Minister on 27.12.2021. Financial closure of the project was achieved on 18.04.2022 and agreement signed with H.P. State Cooperative bank.
Main Civil & HM works package was awarded to M/s Rithwik Projects Pvt. Ltd., Hyderabad on 06.05.2021. River has been diverted on 15.02.2022. Excavation for all the project components i.e. Dam, Power House and Tail Race Channel has been completed in all respect. Dam concreting is in full swing and 92% concreting completed. In Power house area, concreting of columns and beams in machine hall area has been completed and further, concreting is in progress. Cumulative 81% concreting completed in Power house area. Installation of draft tube gates of main units were completed on 04.06.2025. Penstock erection in Unit-1 & Unit-2 is in progress and cumulative, 97% erection completed. Erection of 2 nos. radial gates in dam block no. 4 and intake gates for all units are also in progress.
EM package for main works awarded to M/s Voith Hydro Pvt. Ltd. on 19.01.2022. Erection of Draft tube liners for both units completed on 13.05.2024. Civil fronts have been handed over for erection of spiral casing for unit - I & II and erection works are under progress. Generator transformers for main units have been shifted to transformer yard. Erection of EOT crane in service bay completed on 15.11.2024 and further, extension of rail in machine hall has also been completed.
Power evacuation system: Power from the project shall be evacuated from 220 kV network/ substation of HPPTCL. Work of construction of 220 kV Transmission line from switchyard to HPPTCL network awarded to M/s KEC International Pvt. Ltd on 14.06.2022. Forest clearance Stage-1 accorded by MoEF&CC on 29.05.2025 and approval for execution of work in Forest land has been accorded on 06.10.2025. Signing of agreements for purchase of private land is in progress. Work of tower foundation and tower erection is in progress.
5) Sunni Dam HEP (382 MW):
Sunni Dam HEP is a run-of-the-river (RoR) scheme on river Satluj located near Khaira village in Shimla and Mandi districts of Himachal Pradesh. The Project will generate 1382 MU of energy in a 90% dependable year. Govt. of H.P. re-allotted the project on "Stand Alone Basis” to SJVN on 29.08.2017. MoU was signed with Govt. of Himachal Pradesh on 25.09.2019. Ground breaking ceremony of the Project was presided over by Hon’ble Prime Minister on 27.12.2021.
After obtaining all statutory clearances, investment approval amounting to Rs. 2614.51 Cr accorded by GoI on 12.01.2023 with completion period of 63 months from date of CCEA approval.
Civil Works: Main Civil & HM works package was awarded to M/s Rithwik Projects Private Limited on 14.01.2023. Double-Lane Steel Truss Bridge work has been completed in all respect on 31.01.2026. All the approach roads to the Project components have also been completed. After completion of 510 m long diversion tunnel, river diverted on 13.01.2024 within schedule. Construction of upstream and downstream Coffer Dams have been completed. Excavation of Dam upto EL. 632 m has been completed. Stilling basin excavation and Intake excavation is in progress.
Underground works are also going on in full swing at all the fronts. Excavation of Adit to powerhouse, Adit to Transformer Hall, Adit to Pressure Shaft bottom, Adit to TRT and Main Access Tunnel have been completed. Excavation of powerhouse cavern and Transformer Hall cavern is in progress. 85% excavation of Power House upto Service Bay level and 66% works of Transformer Hall Crown has been completed. Further, excavation of TRT and Pot-head yard are also in progress.
HM Works: Diversion Tunnel (DT) gate along with hoisting arrangement has been received at site. Fabrication of other HM components is in progress.
EM Works: EM works awarded to M/s BHEL on 01.01.2026. Contract Agreement signed with BHEL on 05.02.2026.
Construction Power: Construction power for initial requirement has been made available at site, while for peak requirement, work of 22 kV line from HPSEB’s substation at Gumma to Dam site through HPSEB Ltd. has also been completed. All major components including double pole structures, structure hardware (angle, cross-arm, insulators), span, sag & tensioning have been completed.
Power evacuation system for Sunni Dam HEP: Power from the Project shall be evacuated through 200kV Transmission line (Twin Moose Conductors) between Sunni Dam HEP switchyard to Ogli ISTS pooling station.
6) GUVNL Phase XXI- Khavda Solar Power Project (500MW)
SJVN secured a 500 MW solar power project under GUVNL Phase XXI at GIPCL RE Park, Khavda, Gujarat. PPA at 2.54/kWh was signed with GUVNL on 09.07.2024 by SGEL and financial closure has been achieved. Pursuant to transfer of the Project to SJVN, the PPA has been transferred from SGEL to SJVN w.e.f. 01.06.2026.
The Implementation & Support Agreement and Land Lease Agreement have been executed with GIPCL, Upfront Development Charges of 116 crore has been paid and Plots 1,3, 4, 5 and 6 have been allotted at the GIPCL RE Park.
EPC works have been awarded to three contractors:
Project 1 - 200 MW (M/s Sterling & Wilson Renewable Energy Ltd.):
EPC contract awarded on 16.10.2025 and the Contract Agreement signed on 11.11.2025, with commissioning targeted for 20.11.2026.
Project 2 - 200 MW (M/s KPI Green Energy Ltd.):
EPC contract was awarded on 16.10.2025 and Contract agreement signed on 11.11.2025, with commissioning targeted for 20.11.2026.
Project 3 - 100 MW (M/s Larsen & Toubro Ltd.):
EPC contract was awarded on 16.10.2025 and contract agreement signed on 14.11.2025 with commissioning planned for 20.11.2026.
7) GUVNL Phase XXII-SJVN Solar Power Project (150MW)
SJVN has secured a 200 MW solar power project under GUVNL Phase-XXII to be developed in Gujarat. PPA at 2.63/kWh was signed with GUVNL on 09.04.2024 by SGEL and financial closure has also been achieved as per PPA. Pursuant to transfer of the Project to SJVN, the PPA has been transferred from SGEL to SJVN w.e.f. 01.06.2026.
The land acquisition milestone due on 08.10.2025 could not be met, and has sought extension up to the SCSD without levy of time-extension charges.
EPC awards have been placed for 150 MW. 100 MW to M/s Prozeal Green Energy Ltd. and 50 MW to M/s Oriana Power Ltd. with LoAs issued on 17.10.2025 and contract agreements signed on 10.11.2025 and 04.11.2025, respectively. The remaining 50 MW capacity under Phase-XXII is yet to be awarded.
8) GUVNL Phase XXIII- Khavda Solar Power Project (200 MW)
SJVN secured a 200 MW solar power project under GUVNL Phase XXIII at GSECL RE Park, Khavda, Gujarat. PPA at 2.66/kWh was signed with GUVNL on 09.07.2024 by SGEL and financial closure has been achieved. Pursuant to transfer of the Project to SJVN, the PPA has been transferred from SGEL to SJVN w.e.f. 01.06.2026.
Works have been awarded to two (02) contractors:
Project 1- 100 MW (M/s Bridge and Roof Co. (I) Ltd.)
EPC contract was awarded on 17.10.2025 and contract agreement signed on 12.11.2025 with commissioning planned for 21.11.2026.
Project 2- 100 MW (M/s Dineshchandra R. Agrawal Infracon Pvt. Ltd.)
EPC contract was awarded on 16.10.2025 and contract agreement signed on 14.11.2025 with commissioning planned for 20.11.2026.
B) PROJECTS UNDER PRE-CONSTRUCTION, SURVEY & INVESTIGATION STAGES:1. Hydro power Projects in Nepal
i) Lower Arun HEP (669 MW)
Lower Arun HEP was allotted to SJVN by Govt. of Nepal on 04.02.2021 with an installed capacity of 669 MW with an annual generation of 2901 MU. The project is located in the Sankhuwasabha and Bhojpur districts of Eastern Nepal on river Arun, d/s of existing Arun-3 HEP (900 MW) which is under construction by SAPDC (wholly owned subsidiary of SJVN). The Project is envisaged to be operated in Tandem with Arun-3 HEP
Investment approval for Rs. 74.60 Cr for pre-construction activities of the project was accorded by GoI on 02.03.2022. DPR of the Project was approved by IBN, GoN on
31.03.2022. Techno-Economic Appraisal of the Project has also been accorded by CEA on
31.10.2022.
Project Development Agreement signed with GoN on 01.06.2023. Investment approval of Rs. 5792.36 Cr. recommended by PIB on 18.05.2023. CCEA approval accorded on 02.08.2024. NIT for Civil and HM Works Packages P1 & P2 floated on 01.11.2024; Pre- bid meeting held on
29.11.2024. After the bid opening, techno-commercial bid evaluation report in respect of Package P1 & P2 has been completed. Price bids of package P-1 & P-2 opened on
17.04.2026.
ii) Upper Karnali HEP (900 MW):
Upper Karnali Hydro Electric Project is a run-of-the-river project located in Nepal. SJVN has partnered with GMR and IREDA for the development of this cross-border project.
The Ministry of Power, Government of India, approved the proposal of SJVN and IREDA for joining the Special Purpose Vehicles for Generation and Transmission Companies on
23.08.2024. Subsequently, MoU was signed between SJVN, GMR, and IREDA on 09.09.2024 for the development of the project. The updated Detailed Project Report was submitted to the CEA on 15.09.2024.
The Investment Board of Nepal (IBN) accorded approval on 01.12.2024 for the induction of SJVN and IREDA as equity partners in the Project. The Board structures of both SPVs (Generation Company & Transmission Company) has been approved, incorporating additional independent directors in line with Nepali regulations. The project will be implemented through two Special Purpose Vehicles:
GMR Upper Karnali Hydropower Limited (GUKHL) for generation, with shareholding of 34% each by SJVN and GMR, 5% by IREDA and 27% as free equity to Nepal Electricity Authority (NEA)
Karnali Transmission Company Pvt. Limited (KTCPL) for transmission, with shareholding of 47.5% each by SJVN and GMR, and 5% by IREDA.
The total project cost is estimated at INR 9145 crore, with a debt requirement of INR 6402 crore based on a debt-to-equity ratio of 70:30.
CEA approved the Detailed Project Report for development of Upper Karnali HEP (900 MW) vide office memorandum dated 12.09.2025. The final drafted Amended and Restated JV Agreement (ARJVA) submitted to Nepal Electricity Authority (NEA). The project is a strategic step in expanding SJVN’s international hydropower portfolio.
2. Hydro power projects in Arunachal Pradesh:
i) Attunli HEP (680MW):
Project allotted by GoAP on 21.07.2023 and MoA signed with GoAP on 12.08.2023. Transfer of concurrence and extension of validity of DPR upto 31.12.2025 accorded by CEA on
09.11.2023. Further, re-validated by CEA upto 30.06.2027 on 09.02.2026.
Case for diversion of 261.53 ha forest land was submitted on 15.02.2024 and forwarded to MoEF&CC, New Delhi on 11.01.2025. Stage-1 Forest
Clearance accorded by MoEF&CC on 09.06.2026. Further, FRA certificate/ consent from Gram Sabha is being obtained.
For Environment Clearance, Fresh TOR accorded by MoEF&CC on 05.03.2024. EIA/ EMP report submitted to State Pollution Control Board on 29.12.2025. Public hearing held on
01.04.2026 and minutes received on 04.05.2026.
EIA/ EMP report updated and application for EC has been submitted on Parivesh Portal on
17.06.2026.
For Private land acquisition, SIA report approved by GoAP on 05.09.2024 and notification under Section-11 of LARR Act issued by GoAP on 08.10.2024. Final declaration under Section-19 issued on 10.06.2026 and notice U/S- 21 issued on 11.06.2026. Draft award for compensation and R&R Plan is under preparation by District Administration.
3. SJVN Renewable Project:
i) GUVNL Phase XXII- SJVN Solar Power Project (50 MW)
SJVN has secured a 200 MW solar power project under GUVNL Phase-XXII to be developed in Gujarat. PPA at 2.63/kWh was signed with GUVNL on 09.04.2024 by SGEL and financial closure has also been achieved as per PPA.
EPC awards have been placed for 150 MW. The remaining 50 MW capacity under Phase-XXII is under tendering stage and yet to be awarded.
C) PROJECTS UNDER LONG-TERM PIPELINE:
Projects with an aggregate capacity of 5,693 MW, spread across India and Nepal are under the Company's long-term development pipeline.
7. PROGRESS OF PROJECTS (RENEWABLE ENERGY)
The Renewable Energy Projects of SJVN are being developed through its wholly owned subsidiary SJVN Green Energy Limited (SGEL).
A. PROJECTS UNDER OPERATION (1460 MW)1. Parasan Solar Power Project (75 MW)
The Parasan Solar Power Station, with a capacity of 75 MW, is located in a solar park and was awarded through Tariff-Based Competitive Bidding conducted by the Uttar Pradesh New & Renewable Energy Development Agency (UPNEDA) on 17.05.2021. The Power Purchase Agreement (PpA) was signed with UpPcL on 16.06.2021 at a tariff of '2.68 per unit. Developed by M/s Solar World under EPC mode, the project was commissioned in September 2022 and achieved its Commercial Operation Date (COD) on 22.11.2022. The plant generated 136.619 MU in FY 2025-26. Consolidated generation from COD till
31.03.2026 is 492.107 MU.
2. Gurhah Solar Power Project (75 MW)
The Gurhah Solar Power Station, with an installed capacity of 75 MW, was awarded through Tariff-Based Competitive Bidding conducted by the Uttar Pradesh New & Renewable Energy Development Agency (UPNEDA) on 05.01.2022. The Power Purchase Agreement (PPA) was signed with UPPCL on 03.02.2022 at a tariff of '2.98 per unit. Situated in a solar park, the project was developed by M/s Solar World under EPC mode. The project was commissioned and became operational on 29.12.2023 & has generated 146.521 MU in 2025-26. Consolidated generation from COD till 31.03.2026 is 332.585 MU.
3. Gujrai Solar Power Project (50 MW)
The Gujrai Solar Power Station, with a capacity of 50 MW, was awarded through Tariff-Based Competitive Bidding conducted by the Uttar Pradesh New & Renewable Energy Development Agency (UPNEDA) on 05.01.2022. The Power Purchase Agreement (PPA) was signed with UPPCL on 03.02.2022 at a tariff of '2.98 per unit. The project, developed by M/s Solar World under EPC mode. The project has Commissioned and operational since 22.02.2024 & generated 92.413 MU in FY 2025-26. Consolidated generation from COD till 31.03.2026 is 198.423 MU.
4. Raghanesda Solar Power Project (100 MW)
The Raghanesda Solar Power Station, with a capacity of 100 MW, was secured through Tariff- Based Competitive Bidding conducted by Gujarat Urja Vikas Nigam Limited (GUVNL) on 11.10.2021, with the Power Purchase Agreement (PPA) signed at a tariff of '2.64 per unit with GUVNL on 13.01.2022. The project, developed by M/s TPREL under EPC mode. It was commissioned on 29.02.2024, and its Commercial Operation Date (COD) achieved on
02.04.2024. The project has generated 239.632 MU in FY 2025-2026. Consolidated generation from COD till 31.03.2026 is 438.135 MU.
5. Omkareshwar Floating Solar Power Project (90 MW)
SJVN secured the 90 MW Floating Solar Power Project at Indira Sagar Dam, Omkareshwar, Madhya Pradesh, through Open Competitive Bidding conducted by Rewa Ultra Mega Solar Ltd. (RUMSL) with LOA dated 30.06.2022. The Power Purchase Agreement (PPA) was signed with MPPMCL on 04.08.2022 at a tariff of '3.26 per unit. Developed within a solar park, the project was awarded to M/s Larsen & Toubro Limited on 29.11.2022. It achieved Commercial Operation Date (COD) in two phases—45 MW on 07.10.2024 and the remaining capacity on 30.10.2024 and generated 174.578 MU in FY 2025-2026. Consolidated generation from COD till 31.03.2026 is 255.934 MU.
6. 1000 MW Bikaner Solar Power Project under CPSU Scheme (Tranche III)
The 1000 MW Bikaner Solar Power Project, awarded to SJVN under the CPSU Scheme (Tranche III) in September 2021, has developed in Bikaner, Rajasthan, at a tariff of '2.57/unit with a Viability Gap Funding (VGF) support of '44.72 lakh/MW. The Letter of Award (LoA) was issued on 04.10.2021, and Power Usage Agreements (PUAs) have been signed with Uttarakhand Power Corporation Limited (UPCL) for 200 MW, Jammu & Kashmir Power Corporation Limited (JKPCL) for 300 MW, and Rajasthan Urja Vikas and IT Services Limited (RUVITL) for 500 MW. M/s Tata Power Solar Systems Limited has been engaged as the EPC contractor. Project commissioned in phase manner with first COD on 02.04.2025 of capacity 241.77MW and project got full commissioned on 24.12.2025 and generated cumulative energy of 1085.512 MU in FY 2025-26.
7. APDCL SPP (70 MW) - Dhubri, Assam
SJVN bagged a 70 MW Solar Power Project through Tariff-Based Competitive Bidding conducted by Assam Power Distribution Company Limited (APDCL) on 28.08.2023, with the Power Purchase Agreement (PPA) signed on 07.02.2024 at a tariff of '3.92 per unit. The Engineering, Procurement, and Construction (EPC) contract was awarded to M/s Rays Power Infra Private Limited on 20.02.2024. It was commissioned on 31.01.2026, and its Commercial Operation Date (COD) achieved on 05.02.2026. The project has generated 16.016 MU in FY 2025-26.
B. UNDER-CONSTRUCTION & PRE-CONSTRCUTION PROJECT
|
Project Under Construction
|
|
Project Name
|
Capacity
(MW)
|
State
|
Anticipated
COD
|
|
1
|
Bagodra Solar Power Project
|
70
|
Gujarat
|
March-2027
|
|
2
|
GUVNL Phase-XIII Solar Power Project
|
100
|
Gujarat
|
June-2027
|
|
3
|
GUVNL Phase-XIV Solar Power Project
|
260
|
Gujarat
|
June-2027
|
|
4
|
Jamui Solar Power Project (Phase-I)
|
75
|
Bihar
|
July 2026
|
|
5
|
APDCL Solar Power Project
|
50
|
Assam
|
July 2026
|
|
6
|
GUVNL Phase-XVII Solar Power Project (Khavda)
|
200
|
Gujarat
|
Dec 2026
|
|
7
|
RUVNL Solar Power Project (Nawa)
|
100
|
Rajasthan
|
Sep 2026
|
| |
TOTAL
|
855
|
|
|
|
Project Under Pre-Construction
|
|
Project Name
|
Capacity
(MW)
|
State
|
Anticipated COD
|
|
1
|
PSPSCL ET-2 Solar Power Project
|
100
|
Punjab
|
March 2027
|
|
2
|
PSPSCL ET4 Solar Power Project
|
200
|
Punjab
|
March 2027
|
|
3
|
PSPSCL ET-3 Solar Power Project
|
1000
|
Pan India
|
March 2027
|
|
4
|
APDCL Solar Power Project
|
200
|
Assam
|
December 2027
|
| |
TOTAL
|
1500
|
|
|
8. BUSINESS DEVELOPMENT PLAN AND FUTURE BUSINESS STRATEGY
I. Introduction and Strategic Vision
SJVN, a leading Central Public Sector Undertaking (CPSU) under the Ministry of Power, Government of India, is committed to becoming a key contributor to India’s sustainable energy transition. With a strong foundation in hydroelectric generation and an ambitious growth roadmap in solar, wind, and green hydrogen, SJVN’s strategic vision is to emerge as a 50,000+ MW company by 2040. This Business Development Plan for 2025-2030 outlines the initiatives required to build a diversified, digitally enabled, and environmentally responsible energy enterprise aligned with national goals.
II. Industry Landscape and Strategic Fit
India’s power sector is at an inflection point. The country has pledged to install 500 GW of non¬ fossil capacity by 2030 and attain net zero by 2070. Hydropower is being repositioned as a key enabler of grid stability and renewable integration. SJVN’s core strength in large and run-of- the-river hydro projects, particularly in Himachal Pradesh, Uttarakhand, and Arunachal Pradesh, places it in a strategic position to contribute to this transition. Further, government support for pumped storage, green open access, and RE integration offers new business avenues.
III. Organizational Mission and Goals
SJVN’s mission is to generate reliable and affordable power through environmentally sustainable and economically viable projects. The company aims to scale its installed capacity of 25,000 MW by 2030, 50,000+ Mw company by 2040 with a strong mix of hydro, solar, wind, and storage. The development plan envisions a balanced portfolio that supports base load (hydro), peak load (pumped storage), and variable demand (solar/wind + storage).
IV. Growth Strategy and Core Focus Areas
• Hydro Power Expansion
Hydropower remains the backbone of SJVN’s portfolio. The plan includes fast-tracking the execution of major under-construction projects such as the 210 MW Luhri Stage-I, 66 MW Dhaulasidh, and 382 MW Sunni Dam, MoU signed for development of 680 MW Attunli HEP in State of Arunachal Pradesh which are under different stages of clearances. among others. Strategic tie-ups with state governments will unlock stalled projects, while international ventures in Nepal and Bhutan will be explored to leverage SJVN’s hydro expertise. In addition, the company will diversify into pumped hydro storage, critical for balancing intermittent renewables.
Further, SJVN signed MoU for the development of 1800 MW Kotpali Pump Storage Project (PSP) in State of Chhattisgarh. SJVN is in process for taking over Hydro projects on Arun River and other valley. Draft JVA i.r.o. 900 MW GMR Upper Karnali HEP in Nepal is under finalization with Nepal Electricity Authority, Govt of Nepal.
• Solar and Wind Capacity Addition
SJVN aims to add 10-12 GW of solar and wind capacity by 2030. It will develop ultra-mega solar parks (UMREPPs), participate in SECI and state RE auctions, and set up hybrid and floating solar projects. Focus will be on high-sunlight zones such as Rajasthan, Gujarat, and Maharashtra. Wind projects, including wind-solar hybrids, will be established in Tamil Nadu, Karnataka, and Andhra Pradesh. Captive solar for internal consumption and third-party sale under green OA will also be pursued.
• Green Hydrogen Pilots
In alignment with the National Green Hydrogen Mission, SJVN will establish pilot-scale hydrogen production using dedicated solar power, especially in arid regions. A 10-20 TPD green hydrogen facility set up as a demonstration project, with future scaling based on commercial viability. Ministry of Power (GOI) has nominated SJVN as nodal agency for development of green hydrogen project in Nepal. SJVN is in process with Government of Nepal for the development of green hydrogen projects.
• Cross-Border and Global Expansion
SJVN will capitalize on India’s cross-border energy diplomacy by developing hydro projects in Nepal (Arun-3: 900 MW) and evaluating opportunities in Bhutan. The plan includes exporting surplus power and setting up O&M joint ventures or consultancy services in neighboring countries. Support from Indian EXIM Bank and bilateral funding will be leveraged to minimize project risk.
V. Strategic Partnerships and Technology Integration
SJVN will form strategic alliances with:
• Technology providers for hydrogen, battery storage, and smart grids.
• EPC partners and OEMs for faster execution of RE projects.
• Research institutions like IIT Roorkee and CPRI for hydro safety and innovation.
• Private sector players and startups through PPP models and innovation funds.
These collaborations will enable faster adaptation to new technologies and foster co¬ creation of high-impact energy solutions.
VI. Digitalization and Operational Excellence
To enhance plant efficiency and reduce downtime, SJVN will deploy advanced SCADA systems, digital twins for large hydro stations, and predictive maintenance tools using IoT and AI. Project management will be digitized using BIM (Building Information Modeling) and ERP- based dashboards. All new solar and wind plants will be fully automated, with centralized performance monitoring through a Renewable Energy Command Centre.
VII. ESG and Sustainability Commitments
As a responsible PSU, SJVN will integrate ESG at the core of its operations:
• Environment: Adopt zero-water discharge in RE plants, biodiversity restoration near hydro sites, and carbon offset programs.
• Social: Focus CSR on health, education, and skill development for host communities. Local hiring and livelihood support will be emphasized.
• Governance: Strengthen procurement transparency, grievance redressal, and BRSR- aligned ESG reporting.By 2030, SJVN will aim to reduce carbon intensity by at least 25% and strive toward partial carbon neutrality for new plants.
VIII. Financial Planning and Investment Strategy
SJVN’s estimated capital investment requirement is approximately 75,000 crore over the 2025-2030 period. The funding mix will include:
• Equity through IPO/FPO of subsidiaries (e.g., SJVN Green Energy Ltd.).
• Long-term debt from PFC/REC/IREDA at concessional green finance rates.
• Green bonds and sovereign climate funds.
• Asset monetization via InvITs (especially for solar).
The target is to maintain a healthy debt-equity ratio of 70:30, while ensuring timely returns from commissioned assets to fund future growth organically.
IX. Organizational Resilience and Talent Development
The energy transition requires new skills, processes, and leadership competencies. SJVN will:
• Upskill employees in RE, digital operations, and project management.
• Restructure business verticals for faster RE execution.
• Create an internal innovation hub for pilot projects and idea incubation.
• Foster a performance-driven culture with KPIs linked to business targets.
X. Monitoring, Risk Management, and Governance
Project execution will be monitored via an integrated control room linked to the CMD’s dashboard. Third-party audits, regular reviews, and satellite-based monitoring will be implemented for hydro and RE project sites. Risk management plans will cover financial, environmental, and stakeholder-related issues, with special attention to land acquisition, cost escalation, and force majeure.
XI. Conclusion
SJVN stands at a strategic crossroads, equipped with a legacy of reliable hydropower generation and a clear mandate for green energy leadership. This Business Development Plan provides a bold but realistic roadmap to scale, diversify, and modernize its operations. With supportive policies, committed leadership, and an agile approach to innovation, SJVN
can emerge as a national and regional champion in the clean energy sector, delivering both shareholder value and sustainable development outcomes for the country.
8.2 Future Business Strategy
Introduction
SJVN Limited, a Navratna Central Public Sector Undertaking under the Ministry of Power, has evolved from a hydropower-centric utility into a diversified energy company. With India’s ambitious targets of 500 GW non-fossil fuel capacity and net-zero emissions by 2070, SJVN’s role is transitioning from being a power producer to becoming a renewable infrastructure integrator, regional developer, and clean energy exporter. Its future business opportunities lie not only in generation but across the entire value chain—from production to transmission, trading, and energy storage—with a deepening focus on technological innovation, geopolitical strategy, and cross-sector collaboration.
1. Hydropower: Strategic Expansion & Geopolitical Leverage
a) Traditional and Pumped Storage Hydro
SJVN’s legacy in hydropower is its strongest foundation. India’s economically exploitable hydro potential remains largely untapped—especially in Himalayan states and northeast India. Key opportunities:
• New Hydro Projects: Develop remaining potential in Himachal Pradesh, Uttarakhand, Sikkim, Arunachal Pradesh, and Ladakh, targeting both run-of-the-river and reservoir- based systems.
• Pumped Storage Hydro (PSH): With the grid requiring balancing services to accommodate renewable variability, PSH is becoming essential. SJVN can capitalize on hilly terrain to build daily and seasonal storage plants and offer ancillary and balancing services.
b) Projects in Chenab Basin (Lahaul & Spiti, Chamba)
The current developments around Indus Waters Treaty are deeply troubling. Following the heinous attack on tourists in Pehelgam, India has announced that Indus Waters Treaty, the only water sharing mechanism between India and Pakistan put in place in 1960, has been put in abeyance. SJVN has been allotted multiple strategic hydro projects in the Chenab Basin, aimed at asserting India’s rights under the Indus Waters Treaty (IWT). These include:
|
S. No.
|
Projects Name
|
Capacity (MW)
|
Districts
|
|
1
|
Reoli Dugli
|
456
|
Lahaul & Spiti
|
|
2
|
Purthi
|
234
|
Lahaul & Spiti
|
|
3
|
Sach Khas
|
287
|
Chamba
|
|
4
|
Bardang
|
166
|
Lahaul & Spiti
|
these projects are vital for India’s geopolitical and hydrological assertion over its share of the western rivers and contribute to long-term energy sovereignty and regional stability.
c) Cross-Border Hydro Development
Nepal: Beyond Arun-3 (900 MW) SJVN is developing Lower Arun and Arun-4, potentially totaling 1,800-2,000 MW. SJVN is in process for taking over Hydro projects on Arun River and other valley.
• These projects support regional energy trade with Nepal and Bangladesh. Further, SJVN signed MoU with GMR, IREDA for the development of Upper Karnali (900 MW). The JVA is under finalization with Nepal Electricity Authority, Govt of Nepal.
• Bhutan: Engagements are underway to partner in upcoming hydro projects under India- Bhutan cooperation.
Strategic Opportunity: Strengthen India’s position in water diplomacy and clean energy trade, while expanding SJVN’s role as a transnational utility.
2. Solar Energy: Scalable, Modular, and Diversified Deployment
SJVN targets 10,000 MW of solar energy by 2030 across central schemes, state allocations, and market-based bids.Key Business Areas:
a) Utility-Scale Solar Parks
• Develop large-scale solar parks in Rajasthan, Gujarat, Maharashtra, MP, and Odisha, where high solar irradiance and land availability offer lower LCOE (Levelized Cost of Electricity).
• SJVN can act as both developer and EPC aggregator, earning margin from capacity development and trading.
b) Floating Solar
• Install solar PV systems on existing hydro reservoirs and lakes, optimizing water use and reducing land footprint.
• Locations: Gobind Sagar (HP), Digha Dam (Bihar), Barapani (Meghalaya) etc.
• Potential capacity: ~300—500 MW.
c) Rooftop and Distributed Solar
• Expand under schemes like PM Surya Ghar, CPSU Phase-II, and PM-KUSUM for solarizing agriculture and urban buildings.
• Collaborate with states to install rooftop solar on government buildings, schools, and health centers.
d) Solar-Wind Hybrid + RTC Power
• Bundle solar with wind and storage to create Round-the-Clock renewable power plants.
• Market demand from large DISCOMs, Railways, and corporates seeking 24x7 green energy.
Revenue Model: Secure long-term PPAs (25 years), leverage VGF/subsidy schemes, and reduce capital cost through economies of scale.
3. Wind Energy: Onshore and Offshore Markets
Wind complements solar by supplying power at different hours. SJVN aims to build 1,500+ MW of wind projects by 2030.Business Opportunities:
a. Onshore Wind
• Target windy regions in Karnataka, Tamil Nadu, Gujarat, and Maharashtra through:
• Open access projects for commercial clients.
• Participation in SECI wind tenders.
• Development of in-house EPC or JV platforms with turbine manufacturers.
b. Offshore Wind
• Collaborate with MNRE for pilot projects off Gujarat coast.
• India plans to tender 4 GW of offshore wind by 2026, backed by international financing. Opportunity: Add dispatch diversity to RE portfolio, qualify for hybrid power schemes, and create a resilient asset base across geography and weather patterns.
4. Energy Storage: BESS and Grid Flexibility
As grid flexibility becomes critical, Battery Energy Storage Systems (BESS) offer SJVN new business lines:
Use Cases:
• Co-located storage at solar/wind sites to shift excess generation.
• Standalone grid-scale storage to participate in future capacity markets.
• Urban/industrial behind-the-meter storage for peak shaving and backup.
Market Support:
• India’s storage tender pipeline: ~13 GWh by 2030.
• SJVN can use storage to offer firm renewable power, enhancing tariff realization in RTC bids.
Revenue Model: Capacity payments, arbitrage trading, ancillary services.
5. Green Hydrogen.
India targets 5 MMT of green hydrogen production by 2030. SJVN can pioneer green hydrogen in high-potential areas. Ministry of Power (GOI) has nominated SJVN as nodal agency for development of green hydrogen project in Nepal. SJVN is in process with Government of Nepal for the development of green hydrogen projects.
Opportunity Areas:
• Use excess solar/hydro power for electrolyzer-based hydrogen production.
• Set up ammonia synthesis units near ports (e.g., Kandla, Pipavav) for export.
• Supply green hydrogen for refineries, fertilizers, and heavy transport.
Project Models:
• Develop plants in HP or Rajasthan.
• Partner with NTPC, GAIL, or private players for scale-up.
• Participate in MNRE’s PLI scheme for green hydrogen.
Strategic Value: Future-proof diversification and alignment with global green energy export markets.
6. Transmission and Grid Infrastructure
Transmission is a bottleneck for renewable expansion. SJVN can expand into:
• Developing transmission lines under tariff-based competitive bidding (TBCB).
• Building dedicated green energy corridors for its RE assets.
• Collaborating with PGCIL and state transcos via joint ventures.
Opportunity: Become a fully integrated power utility handling generation, transmission, and trading.
7. Power Trading and Energy Market Integration
With a Category-I license, SJVN can act as a RE aggregator and trader.
Business Scope:
• Sell surplus or merchant power via IEX and PXIL.
• Provide balancing and forecasting services to third-party generators.
• Export clean energy to Bangladesh, Nepal, Bhutan under SAARC electricity trade. Growth Frontier: Regional power pool operator for South Asia.
Conclusion
SJVN is poised to transform from a regional hydro utility into a national and cross-border clean energy conglomerate. Its future business lies in:
• Clean energy generation (hydro, solar, wind)
• Firm dispatchable power (RTC, BESS, PSP)
• Green fuels (hydrogen, ammonia)
• Energy infrastructure (transmission, trading)
• Regional leadership (Indus Basin, SAARC region)
By aligning with India’s climate goals, strategic imperatives, and global clean energy shift, SJVN has the potential to play a defining role in shaping South Asia’s low-carbon future.
9. SJVN IN POWER TRADING BUSINESS
Besides power generation, SJVN has diversified into power trading business also. SJVN has been granted Category I Trading License for Inter-State Trading in Electricity in whole of India by Central Electricity Regulatory Commission vide Office Order dated 10th January 2022.
Further, we also have Memberships at all 3 Power Trading Exchanges of India i.e IEX, PXIL and HPX. SJVN has also set up trading desk with an aim to provide short term, medium term and long-term solution to the electricity customers. SJVN is actively engaged in discussions with the Nepal Electricity Authority (NEA) to explore and facilitate cross-border power trading opportunities.
Power trading department has signed a PPA with STPL, which is SJVN'S wholly owned subsidiary, for the sale of 15% of unallocated power to Power Exchanges/bilateral. A Letter of Award (LoA) has also been received from NTPC Vidyut Vyapar Nigam Limited (NVVN) for the procurement of up to 200 MW of power through SJVN Power Trading Department.
From the commencement of Power Trading Business up to 31st Mar 2026, SJVN has traded a cumulative volume of 230 MU.
10. SJVN AS RENEWABLE ENERGY IMPLEMENTING AGENCY (REIA)
In line with the Government of India's ambitious target to achieve 50% of the country's electricity demands from renewable energy sources by 2030 and reach net zero emissions by 2070, SJVN Limited has been designated as Renewable Energy Implementing Agency (REIA) by the Ministry of New and Renewable Energy (MNRE) on 24 April, 2023.
As REIA, SJVN has been entrusted with the responsibility to select Renewable Energy Power Developers (RPDs) through Tendering Process, for setting up and supply of various forms of renewable energy, including solar power, wind power, wind-solar hybrid power, and firm and dispatchable RE power etc.
The selection process is conducted through a tariff-based competitive bidding procedure complying with the tariff based competitive bidding (TBCB) guidelines issued by the MoP, GoI.
During the Financial Year 2025-26 in line with the directions of the Ministry of Power, MNRE and consent received from various DISCOMs SJVN floated tenders for the selection of developers for implementation of RE Projects for a cumulative capacity of 3.45 GW.Further, Letters of Award (LoAs) have been issued to successful developers for a cumulative capacity of 4.373 GW during the FY 2025-26.
Till date, SJVN has floated tenders for a total capacity of 22.425 GW, out of which LoAs have been issued for a total capacity of 16.023 GW. Further, a cumulative capacity of 2.6 GW is currently under the tendering process and is expected to be concluded by July 2026.
SJVN has executed Power Sale Agreements (PSAs) with DISCOMs/States for an awarded capacity of 5.915 GW across FDRE, solar, wind power, and Battery Energy Storage Systems (BESS) to date, out of which 2.177 GW of PSAs were signed during the Financial Year 2025-26. PSAs for the remaining awarded capacity of 10.108 GW are expected to be signed shortly.
11. SJVN AS NODAL AGENCY FOR ROOF TOP SOLAR (RTS) SCHEME
SJVN Limited is playing a strategic role as the Scheme Implementation Partner under PM Surya Ghar: Muft Bijli Yojana for deployment of rooftop solar projects across Government buildings of allocated union Ministries, residential sectors as well as State Government buildings in the states of Himachal Pradesh, Punjab, and Arunachal Pradesh.
During FY 2025-26, the Company achieved substantial progress in scaling up rooftop solar (RTS) capacity through a structured approach encompassing assessment, tendering, contracting, and project execution.
SJVN successfully completed baseline assessments and tendering for 29.2 MW capacity across Union Government buildings on a PAN-India basis under the Renewable Energy Service Company (RESCO) model through tariff-based competitive bidding and 1 MW in state of Arunachal Pradesh under CAPEX model.
The Company operationalized project execution through the signing of 17 Power Purchase Agreements aggregating 2.49 MW, with projects currently under implementation in Madhya Pradesh, Uttar Pradesh, Chhattisgarh, and Gujarat. The Rooftop project at State Government Secretariat building of Govt. ofArunachal Pradesh is also under implementation.
Further strengthening its project pipeline, SJVN issued Letters of Award for 15.99 MW across a wide geographical footprint including Delhi, Maharashtra, West Bengal, Karnataka, Himachal Pradesh, Uttarakhand, Assam, and Odisha, in addition to ongoing states. Another 5.26 MW capacity is under advanced stages of techno-commercial evaluation, indicating a strong near-term execution pipeline.
Through these initiatives, SJVN is significantly contributing to the Government of India’s vision of promoting clean and affordable energy, reducing carbon footprint of public buildings, and accelerating progress towards national renewable energy targets.
12. SUBSIDIARIES AND JOINT VENTURE COMPANIES A) SUBSIDIARY COMPANIES:
Company has five subsidiaries of which four are wholly owned subsidiary companies as on
31.03.2026. The details of the subsidiaries are as under:
1. SJVN Thermal Pvt. Ltd.
SJVN Thermal Pvt. Ltd (STPL) (earlier, Buxar Bijlee Company Private Limited) has been acquired as 100% subsidiary company of SJVN Ltd on 04.07.2013. The Company has taken up the development of 1320 MW Coal-based Thermal Power Project located near village Chausa in District Buxar of Bihar.
2. SJVN Arun-3 Power Development Company Pvt. Ltd.
SJVN Arun-3 Power Development Company Pvt. Ltd. (SAPDC) was incorporated in Nepal as a wholly owned subsidiary company of SJVN Ltd on 25.04.2013. The company has been formed to execute the 900 MW Arun-3 Hydro Electric Project in Nepal. This project is situated on river Arun in Sankhuwasabha District of Nepal.
3. SJVN Green Energy Limited (SGEL)
SJVN Green Energy Limited (SGEL) has been incorporated as a wholly owned subsidiary company of SJVN Ltd on 30.03.2022 with its registered office at Shimla, Himachal Pradesh. SGEL shall work in the verticals of power generation from renewable sources such as Solar, Wind & Hybrid Projects, Battery Energy Storage system, Biomass, small Hydro and Green Hydrogen based business ventures.
4. SJVN Lower Arun Power Development Company Private Limited (SLAPDC)
SJVN Lower Arun Power Development Company Private Limited (SLAPDC) was incorporated in Nepal as a wholly owned subsidiary company of SJVN Ltd. on 26.05.2023.
The company has been formed to execute the 669 MW Lower Arun Hydro Electric Project in Nepal.
5. SGEL Assam Renewable Energy Limited
SJVN Green Energy Limited has incorporated a Joint Venture Company with Assam Power Distribution Company Limited named “SGEL Assam Renewable Energy Limited” on
18.04.2024. SJVN Green Energy Limited holds 51% equity in SGEL Assam Renewable Energy Limited.
B) JOINT VENTURES:1. Cross Border Power Transmission Company Limited
Cross Border Power Transmission Company Limited (CPTC) is a joint venture of SJVN Ltd. with Power Grid Corporation of India Ltd. (PGCIL) and Nepal Electricity Authority (NEA) for implementation of Indian portion of the transmission line from Nepal. Equity contributions by SJVN, PGCIL & NEA are 41.94%, 41.94%, & 16.13% respectively in the Joint Venture Company.
13. ENVIRONMENT
SJVN is fully committed to conserving and protecting the environment. SJVN endeavors to align its initiatives with India’s national vision of achieving net-zero carbon emissions by 2070. We actively integrate sustainable practices across all projects and operations. Through stakeholder engagement and capacity building, we foster a culture of environmental stewardship at every level. SJVN has a well laid Environment Policy approved by Board of Directors and is reviewed and updated periodically. The policy encourages continuous improvement in our systems, the adoption of innovative measures to prevent pollution, and the promotion of environmental awareness.
SJVN strictly adheres to all policies and guidelines of the Ministry of Environment, Forest and Climate Change (MoEF&CC) concerning identification and mitigation of environmental impacts of projects, which are a part of the Comprehensive Environmental Impact Assessment (CEIA) Study of projects, carried out through reputed organizations/NABET accredited-consultants. All environmental aspects are suitably addressed in the CEIA study. Accordingly, Management Plans are prepared and suitable measures are adopted to negate any adverse impact on the environment and ecology during construction and operation stages of project cycle.
SJVN has also been in consonance with "Mission Life” launched by MoEF&CC and is striving to achieve its aims. SJVN commits to saving energy and water, reducing waste, e-waste, plastic waste and avoiding single-use plastics, and encouraging employees for adopting healthy lifestyles. Along with this, SJVN has been actively contributing towards the “Ek pedh maa ke naam campaign” launched by hon’ble Prime Minister, under which around 3000 trees were planted by SJVN up to March 2026 effectively contributing towards the green cover of the country.
SJVN has three hydro power stations under operation, viz. 1500 MW Nathpa Jhakri HPS (NJHPS) and 412 MW Rampur HPS (RHPS) in Himachal Pradesh and 60 MW Naitwar Mori HPS in Uttrakhand, wherein environmental management measures such as Catchment Area Treatment (CAT), Compensatory Afforestation (CA), Muck Management, Restoration of Muck Disposal sites and Quarry Sites, Green Belt Development, Fisheries Management, Reservoir Rim Treatment, etc. were successfully undertaken. Regular environmental monitoring is done at SJVN projects and six-monthly compliance reports of Environment Clearance conditions are sent to MoEF&CC and other concerned authorities.
Naitwar Mori Hydroelectric Project, on Tons river in Uttarkashi District of Uttarakhand was commissioned in December 2023. A sum of Rs.45.64 crores has been spent against a financial provision of Rs. 32.48 crore on implementation of environmental management measures, which was appreciated by the Government officials during Multidisciplinary Committee (MDC) meeting. Some of the initiatives are below:
i. For implementation of CAT plan, Rs.12.96 crore have been deposited
ii. An amount of Rs.1.84 crore was deposited in CAMPA for CA over 80.00 ha of civil soyam and forest land.
iii. 43 lakhs has been deposited for Biodiversity Conservation and Management Plan prepared by State Forest Department.
iv. Under Fisheries Management Plan (FMP), the fish pass for migratory fish species is under operation. Central Inland Fisheries Research Institute, Barrakpore, West Bengal had vetted the design parameters for effective and sustainable fish pass.
v. To avoid landslides and soil erosion, Reservoir Rim Treatment Plan is being implemented.
vi. Rain water harvesting system along with a 60 KLD STP has been setup at project colony.
vii. Bio composter & Plastic waste bailing machine have been procured for treatment of solid waste of project affected villages and project colony.
viii. AAC bricks having fly ash content about 68% were used in the construction of township and office buildings, resulting in recycling of Waste product.
ix. For energy conservation, energy efficient BEE 5 Star rating electrical appliances have been procured.
At NJHPS, all clearance conditions applicable to the project complied in a timely and satisfactory manner. The project has implemented key environment conservation measures including Catchment Area Treatment, compensatory afforestation, green belt development, muck/quarry site restoration, biodiversity management, soil stabilization, etc. The project promotes awareness initiatives through employee and public participation, along with activities under Swachh Bharat Mission and Mission LiFE. In addition, the project has planted 500 saplings under the “Ek Ped Maa Ke Naam” campaign.
At RHPS, the initiatives taken for environmental considerations are as under:
i. A 1000 KG/day capacity automatic organic waste converter has been installed, supplementing the existing 25 KG/day capacity converter. Compost pits are also being used for making organic compost.
ii. The Direct On-Line (DOL) starters for pump-motor sets were replaced with VFD cum motor control panels in three units. This transition cuts annual energy consumption of the pump-motor sets by 25%, enhancing unit and plant efficiency.
iii. 30kWp Mono-Crystalline based PV Power Plant on Rooftop of Project Hospital Building, Bayal has been installed. This will reduce carbon emissions in the range of 24¬ 45 ton per year.
SJVN has three hydroelectric projects, which are under construction- 210 MW Luhri Stage-I HEP & 382 MW Sunni Dam HEP on River Satluj and 66 MW Dhaulasidh HEP on river Beas in Himachal Pradesh.
At Luhri Stage-I HEP, the implementation status of Environment Management Plan (EMP) was examined by a multidisciplinary committee. EMP amounting to Rs.148.60 crore along with a Corporate Environment Responsibility (CER) plan amounting to Rs.8.6 crore are being implemented at the project, the current status of which was apprised to the committee. Some measures taken at the project site are as follows:
i. Construction of stage at Government Senior Secondary School, Nither-GP- Dehra, by funding an amount of Rs. 12.49 lakh under CER.
ii. An amount of Rs 7.16 lakhs has been spent on ambulance, first aid boxes, medicines, etc.
iii. Environment Lab has also been set up at project site for which Rs. 0.76 lakhs were spent on chemicals, equipment, etc.
Sunni Dam HEP is in early stages of construction. An amount of Rs. 305.46 crore has been kept for implementation of various measures proposed in Environment Management Plan.
To conserve rare, endangered and threatened faunal species and to preserve wildlife in/around the project areas, the project has deposited Rs.105 Lakhs with the state forest department to implement the Wildlife management and conservation plan.
At Dhaulasidh HEP, EMP amounting to Rs. 34.14 crore is being implemented. Some measures are as follows:
i. For Fisheries Management Plan (FMP), an amount of Rs.70 Lakh was deposited to HP Fisheries Department of which Rs. 19.15 lakh has been utilized till date.
ii. Early Warning system for floods has been installed.
iii. 2 STPs in the project site and 1 STP near office building have been installed.
iv. Roof Top solar panel system (50 KW) has been established.
v. Financial assistance provided to local administration (BDO, SDM, Panchayat) of Kangra, Hamirpur and Chamba, for procurement of 460 solar llights.
SJVN Corporate Headquarters (CHQ) is designed and constructed with green building concept equipped with STP of 90 KLD per day capacity for waste water recycling, rain water harvesting system with capacity of 50 KL, natural lighting with provision of sky light glasses, centralized HVAC system, intelligent/automatic sensor-controlled illumination system for
conservation of electricity, etc. Owing to these efforts, CHQ Building has obtained four-star GRIHA rating. Various aspects are as follows:
i. 140 kWP On-Grid Solar Power Plant has been installed.
ii. Water Solar Heating System of 5000 Ltr. Capacity has been installed.
iii. A recycling plant is installed to convert kitchen waste into compost.
iv. AAC blocks are being used in construction of Auditorium Block and Guest House.
v. Bio-Diversity Park has been developed near CHQ in association with Municipal Corporation, Shimla.
SJVN has various Hydroelectric and Pumped Storage projects under Survey and Investigation, of which Attunli HEP (680 MW) in Arunachal Pradesh is at an advanced stage of environment and forest clearance.
SJVN celebrated World Environment Day on 5th June 2025 and organized "Swachhta Pakhwara" in October 2025 to create awareness amongst employees and locals. Pledge for environment protection/conservation and talks on environmental aspects were delivered. In addition, Quiz, Drawing, Origami, awareness programs, etc. were also organized and environmental awareness films were screened. To discourage the single-use plastic, steel bottles were distributed amongst employees and labour at various projects and corporate headquarters. Large scale plantation programs were also undertaken to raise awareness about environmental issues and inculcating a sense of responsibility and stewardship towards our planet.
14. CSRAND SUSTAINABILITY
An annual report of Corporate Social Responsibility, highlighting the Company’s CSR Policy, details of expenditure on CSR and overview of projects/ programs/ activities undertaken by the Company during FY 2025-26 and Summary of Impact Assessment in format prescribed under Companies (CSR Policy) Rules 2014 is annexed as Annexure-V and forms an integral part of this Directors’ Report.
15. REHABILITATION AND RESETTLEMENT
SJVN, being conscious of its responsibilities towards society, is committed to executing and operating power projects in a socially responsible manner by adopting generous Rehabilitation & Resettlement (R&R) measures for the benefit of Project Affected Families (PAFs) by investing in the socio-economic development of communities to continually minimize potential negative impacts as well as to establish the sustainable positive impact of projects on them.
Well before any project is taken up for execution, a Social Impact Assessment (SIA) study is carried out to ensure that the potential socio-economic benefits accrued from the project outweigh the likely social costs and adverse social impact. Public consultation meetings with the stakeholders are held by the project authorities to make local communities aware of developmental facilities to be created in the fields of health, education, sanitation, drinking water, approach roads and other community assets of the project and their benefits to the society. Subsequently, the R&R plan is devised based on conclusive findings derived from the socio-economic survey carried out by an independent expert agency. The R&R plan thus devised and approved essentially prescribes mitigation measures for the reconstruction and regeneration of economies of the PAFs. During the implementation stage of the R&R plan, regular monitoring of R&R activities is conducted through an external independent agency to ensure the timely extension of R&R benefits to the PAFs. Subsequently on completion and implementation of the R&R plan, social impact evaluation is carried out by an independent external agency to assess various tangible and intangible benefits accrued in the area of socio-economic development. To have constant interaction with local people, a Project Information Centre is set up at project level.
SJVN has implemented or is implementing R&R Plans in 07 Power Stations/ Projects:
1. Nathpa Jhakri Hydro Power Station (NJHPS, 1500 MW)
2. Rampur Hydro Power Station (RHPS, 412 MW)
3. Naitwar Mori Hydro Power Station (NMHPS, 60 MW)
4. Luhri Hydro Electric Project Stage-I (LHEP, Stage-1,210 MW)
5. Sunni Dam Hydro Electric Project (SDHEP, 382 MW)
6. Dhaulasidh Hydro Electric Project (DSHEP, 66 MW)
7. Buxar Thermal Power Project (BTPP, 1320 MW)
The details of R&R benefits extended to PAFs in above Power Station/ Power Project are given as under :
The details of R&R benefits extended to PAFs in above Power Station/ Power Project are given as under:
|
Sr.
No.
|
Project
|
State
|
District
|
No. of Project Affected Families (PAFs)
|
% of PAFs covered under R&R benefits
|
R&R
monetary benefits to PAFs. (Rs. in Cr.)
|
LADF payable Amount (Rs. in Cr.)
|
LDF
Amount released so far (Rs. in Cr.)
|
Remarks
|
|
1
|
NJHPS
|
Himachal Pradesh
|
Shimla & Kinnaur
|
480
|
100%
|
66.64
|
NA
|
NA
|
The project has been commissioned and R&R activities are being concluded.
During FY, 2025-26 NJHPS has constructed 02 Nos. of houses under R&R Plan of NJHPS to provide benefits to the landless / houseless families. Total amount spent for construction of these houses is Rs. 0.38 Cr. and the work has been completed.
Further, in FY, 2025-26, NJHPS has provided ownership rights to 128 landless families. The registration and stamp duty fee of Rs.2.90 Cr. has been borne by NJHPS.
Thus total R&R monetary benefits of Rs.66.64 Cr. (which includes Rs.3.28 Cr. of FY, 2025-26) have been provided to PAFs by NJHPS till date.
|
|
2
|
RHPS
|
Himachal Pradesh
|
Kullu & Shimla
|
139
|
100%
|
65.72
|
55.26
|
55.26
|
Project has been commissioned and R&R activities have been concluded.
|
|
3
|
LHEP-1
|
Himachal Pradesh
|
Shimla and Kullu
|
1102
|
97.18%
|
50.91
|
28.69
|
7.17
|
1st installment of LADF amounting to Rs.7.17 Cr. released in FY, 2025-26.
|
|
4
|
SDHEP
|
Himachal Pradesh
|
Shimla & Mandi
|
2731
|
93.84%
|
123.64
|
37.13
|
9.28
|
1st installment of LADF amounting to Rs.9.28 Cr. released in FY 2025-26.
|
|
5
|
DSHEP
|
Himachal Pradesh
|
Hamirpur
|
5
|
100%
|
1.47
|
10.34
|
Nil
|
DSHEP Hamirpur has provided all R&R benefits to all 05 displaced families, comprising 04 houseless and 01 landless families. 1st installment of LADF is under process.
|
|
6
|
NMHPS
|
Uttarakhand
|
Uttarkashi
|
94
|
100%
|
10.39
|
Nil
|
Nil
|
R&R Plan has been approved by District Administration, Uttarkashi (UK) and the total amount of Rs. 14.45 Cr. has been deposited with District Administration, which is under implementation. So far, Rs.10.39 Cr. has been utilized and the remaining amount of Rs.4.06 Cr. is being utilized on various community development works.
|
|
7
|
STPL
|
Bihar
|
Buxar
|
2647
|
100%
(In process)
|
103.23
|
60.00
|
60.00
|
Rehabilitation grant of Rs.33.27 Cr. has been provided to 853 PAFs till date.
|
Besides the above 07 power projects, the following projects are under survey and investigation stage and their R&R status is as under:1. Attunli Hydroelectric Project, Arunachal Pradesh (Attunli HEP, 680 MW): The SIA
report has been accepted and approved by the Govt. of Arunachal Pradesh. The preliminary notification under section-11 of RFCTLARR Act, 2013 has been issued. Land survey completed and assessment of properties on the land under acquisition has been completed. The calculation of compensation for properties and land is under process.
2. Emni Hydroelectric Project (Emni HEP, 500 MW), Amulin Hydroelectric Project (Amulin HEP, 420 MW) and Mihundon Hydroelectric Project (Mihundon HEP, 400 MW), Arunachal Pradesh: The projects are under survey & investigation stage.
Social Impact Evaluation (SIA): The SIA studies of R&R project implementation are carried out by the specialized agencies. Also, the SIA reports reveal that R&R implementation in the project-affected areas has substantially enhanced the socio-economic standards of the local population across various development parameters, such as the economy, health, and education. The World Bank Mission has monitored the R&R activities carried out in NJHPS and RHPS and recognised SJVN’s R&R activities as under:
‘The success of the resettlement activities undertaken in this project are quite rare for India and can be considered as one of the best examples of resettlement implementation in bank-assisted projects in India. It should be considered as an example for other projects.’
16. RESEARCH AND DEVELOPMENT
SJVN has been continuously striving for excellence in its core area of power generation by showing commitment towards research and development, innovation, technology up-
gradation, and product development.
Specific areas in which R&D/Innovations undertaken during FY 2025-26, including
collaborations with various academic institutions, are detailed below.
a. IIT Madras: Development of Alternative material for improved Silt and Cavitation erosion resistance coatings of hydro turbine components.
b. IIT Delhi:
• R&D studies on High performance concrete for high sluice spillways of dams and barrages.
• Establishment of a research facility to analyse the sediment erosion on the uncoated and coated guide vanes of hydro turbines.
c. IIT Roorkee: Development of prototype Hydrokinetic Turbine based on lab scaled model.
d. IIT Patna: Development of Advanced Geological Predictive Model in Tunnelling Projects by Integrating Geo-technical data and predictive analytics at SJVNL site (Sunni Dam) in Himachal Pradesh.
e. HPU, Shimla: Developing an advanced solar PV research ecosystem for improved performance and reliability, promoting innovation, and predictive diagnostics using AI framework.
Apart from above R&D, 17 no. innovative/ technological upgradation measures were also taken at Project sites & Corporate Headquarter of SJVN to enhance the operational efficiency of the organization. The total expenditure by SJVN for R&D/ Innovations initiative works for the FY 2025-26 was INR 29.63 Cr. (including taxes).
17. HUMAN RESOURCES
(I) Employees and Workers including differently abled:
|
S.No.
|
Particulars
|
Total (A)
|
Male
|
Female
|
|
No. (B) | % (B/A)
|
No. C | % (C/A)
|
| |
Employees
|
|
1
|
Permanent (D)
|
1302
|
1152
|
88.48%
|
150
|
11.52%
|
|
2
|
Other than Permanent (E)
|
32
|
29
|
90.63%
|
3
|
9.38%
|
|
3
|
Total employees (D+E)
|
1334
|
1181
|
88.53%
|
153
|
11.47%
|
| |
Workers
|
|
4
|
Permanent (D)
|
270
|
239
|
88.52%
|
31
|
11.48%
|
|
5
|
Other than Permanent (E)
|
2
|
2
|
100.00%
|
0
|
0.00%
|
|
6
|
Total employees (D+E)
|
272
|
241
|
88.60%
|
31
|
11.40%
|
(ii) Differently abled Employees and Workers:
|
S.No.
|
Particulars
|
Total (A)
|
Male
|
Female
|
|
No. (B)
|
% (B/A)
|
No. C
|
% (C/A)
|
| |
Differently abled Employees
|
|
1
|
Permanent (D)
|
22
|
19
|
86.36%
|
3
|
13.64%
|
|
2
|
Other than Permanent (E)
|
0
|
0
|
0.00%
|
0
|
0.00%
|
|
3
|
Total employees (D+E)
|
22
|
19
|
86.36%
|
3
|
13.64%
|
| |
Workers
|
|
4
|
Permanent (D)
|
8
|
7
|
87.50%
|
1
|
12.50%
|
|
5
|
Other than Permanent (E)
|
0
|
0
|
0.00%
|
0
|
0.00%
|
|
6
|
Total employees (D+E)
|
8
|
7
|
87.50%
|
1
|
12.50%
|
SJVN adheres to the Government of India’s guidelines on reservation in employment for Scheduled Caste (SC), Scheduled Tribe (ST), Other Backward Classes (OBC), Persons with Benchmark Disabilities (PwBD), Ex-servicemen (ESM) and Economically Weaker Sections (EWS) thereby promoting inclusivity and diversity in workforce.
With a strong commitment towards continuous growth and capacity building, SJVN accords utmost importance to the enhancement of employee skills and knowledge. During the Financial Year 2025-26, a total of 194 training programs were conducted, comprising 03 foreign study visits/trainings, 04 online programs, 53 in-house programs, and 134 external trainings within India.
These programmes were delivered through institutions of national and international repute, including premier organizations such as LBSNAA Mussoorie, IIMs, IITs, CVC, NPTI, Administrative Staff College of India, CIGRE, CBIP, DPE, THDC, ESCI, INCOLD, SCOPE, GSI Training Institute, Rashtriya Raksha University, Dam Safety Society, Rajbhasha Academy, BIS, Indian Institute of Corporate Affairs, Central Water & Power Research Station, NPC, and ECI, among others.
The training interventions covered a wide spectrum of domains, including preventive vigilance, artificial intelligence, corporate governance, labour codes, women leadership development, coaching & mentorship, inspection and investigation practices, procurement, regulatory and policy frameworks in the power sector, cyber security, electrical safety, pumped storage projects, welding certification, AutoCAD, dam safety, emerging technologies for net-zero transition, financial trends, emotional intelligence, CDA rules, ethics, governance, RFCTLARR Act 2013, Primavera, POSH, and gender sensitization.
To prepare employees for role transitions and future leadership responsibilities, a series of specialized programs under the banner “Kayantran - Future Fit” were conducted for executives in collaboration with IIMs and NPTI.
Further, induction and orientation programs for newly inducted employees were organized at Corporate Headquarters, Shimla. In addition, a mandatory three-week training program for power sector executives was conducted at NPTI, Faridabad (HR) in February 2026.
SJVN also actively participated in digital capacity-building initiatives such as the “iGOT” platform, an initiative of the Capacity Building Commission, Government of India.
On the occasion of International Women’s Day 2026, a special training program was organized at Shimla on 8th March 2026. Capt. (Retd.) Yashika Tyagi was invited as the motivational speaker. The program witnessed enthusiastic participation from women employees across various SJVN projects and offices.
The Company is complying with all the provisions of the Maternity Benefit Act, 1961, and no instances of contravention have been reported to date.
18. INDUSTRIAL RELATIONS
Regular meetings are being held with representatives of various associations/ unions/ Labour Commissioner & other authorities (Central Government & State Government) to address local issues as well as policy-related matters. In addition, recreational, cultural, and sports functions have been organised on various occasions. These initiatives have contributed to fostering better employee-employer relations, and cordial & harmonious industrial relations have been maintained during the year.
19. STATUTORY AND OTHER INFORMATIONS
The information required to be furnished as per the Companies Act 2013, SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015, Government Guidelines, and Code of Corporate Governance of your Company, on the following matters is placed at respective annexures and form integral part of Directors Report: -
a. Management Discussion and Analysis - Annexure - I
b. Report on Corporate Governance - Annexure - II
c. Compliance Certificate on Corporate Governance from Practicing Company Secretary - Annexure - III
d. Information on Conservation of Energy, Technology Absorption and Foreign Exchange earnings and outgo - Annexure - IV
e. Annual Report on Corporate Social Responsibility & Sustainability - Annexure - V
f. Business Responsibility and Sustainability Report & Independent Assurance Statement - BRSR Core - Annexure - VI
g. Certificate regarding Non-Disqualification of Directors - Annexure - VII
h. Secretarial Audit Report - Annexure - VIII
i. Board's Replies to the observations of Secretarial Auditor - Annexure - IX
20. DIRECTORS' RESPONSIBILITY STATEMENT
The Directors’ state that:
• in the preparation of the annual accounts for the year ended March 31,2026, the applicable Accounting Standards read with requirements set out under Schedule III to the Act, have been followed along with proper explanation relating to material departures, if any;
• the Directors have selected such accounting policies and applied them consistently except as disclosed in the Notes on Accounts and made judgment and estimates that are reasonable and prudent so as to give a true and fair view of the state of affairs of the Company as at March 31,2026 and of the profit of the Company for the year ended on that date;
• the Directors have taken proper and sufficient care for the maintenance of adequate accounting records in accordance with the provisions of the Act for safeguarding the assets of the Company and for preventing and detecting fraud and other irregularities;
• the Directors have prepared the annual accounts on a ‘going concern’ basis;
• the Directors have laid down internal financial controls to be followed by the company and that such internal financial controls are adequate and are operating effectively; and
• the Directors have devised proper systems to ensure compliance with the provisions of all applicable laws and that such systems are adequate and operating effectively.
21. DECLARATION OF INDEPENDENCE BY INDEPENDENT DIRECTORS
Your Company has received declarations from all the Independent Directors confirming that they meet the criteria of independence as provided under Section 149(6) of the Companies Act, 2013 and under Regulation 16(1)(b) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015.
22. SECRETARIAL STANDARDS
The Company has complied with the applicable Secretarial Standards during the Financial Year ended 31.03.2026.
23. SEXUAL HARASSMENT PREVENTION
SJVN has implemented the Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013 in its entirety.
Internal Complaints’ Committees as per the provisions of the act have been constituted at Corporate Office and Projects sites of SJVN.
Summary of Sexual harassment issues raised, attended and dispensed during the year 2025¬ 26 has been disclosed in Report on Corporate Governance.
24. RISK MANAGEMENT FRAMEWORK
Risk management framework assists SJVN in integrating risk management into significant activities and functions of the organization. It entails formulation of a Risk Matrix to assign the likelihood of occurrence to the assigned risks viz., controllable, uncontrollable and partly controllable, suggesting mitigation mechanism and lead responsibility centre. SJVN has implemented Risk Management Framework as per ISO 31000:2018 consisting of the following:
1. Risk Identification and Assessment: This includes identification of potential risks that could impact the organization’s objectives and assessment processes across its projects and departments based on their likelihood and potential impact. This entails evaluating both internal factors (such as operational risks, financial risks, and compliance risks) and external factors (such as market risks, regulatory risks, and environmental risks).
2. Risk Mitigation Plan: Once risks are identified, risk mitigation plan are developed to address identified risks. These plans involve implementing preventive measures, establishing control mechanisms, and implementing best practices to minimize the likelihood and impact of risks. For opportunities, SJVN devises action plans to maximize their potential benefits and value.
3. Regular Risk Review and Reporting: Periodic reviews of risks are conducted by organising meetings at project & corporate level and opportunities to ensure their relevance and effectiveness. Frequency of Project Level Risk Steering Committee meeting is on quarterly basis and for Corporate Level Risk Steering Committee meeting is half yearly basis. Besides above, the Board Level Risk Management Committee meetings are held once in six months.
4. Preventive Actions and Continuous Improvement: SJVN emphasizes the implementation of preventive actions to address potential risks proactively. This involves conducting risk assessments, identifying control gaps, and implementing measures to strengthen controls and reduce the likelihood of risks occurring. The organization also fosters a culture of continuous improvement, regularly evaluating and enhancing risk management practices. For continuous improvement, Risk Audit is also conducted annually from external auditor to check the compliance of ISO 31000:2018.
5. Training and Awareness: SJVN provides training and awareness programs to its employees to enhance risk identification, assessment and control capabilities. This ensures that employees across the organization understand their roles and responsibilities for protecting organisational assets, operations & reputation from potential harm and capitalizing on opportunities.
25. SECRETARIAL AUDIT
The Board appointed M/s Akhil Rohatgi & Co., Practicing Company Secretaries, to conduct Secretarial Audit for the Financial Year 2025-26. The Report of the Secretarial Auditors for the year ended 31.03.2026 is placed at Annexure-VIII. Reply of Board to observations of Secretarial Auditor is placed at Annexure-IX.
In compliance to Regulation 24A of SEBI Listing Regulations, Secretarial Audit Report of SJVN Thermal Private Limited (STPL) and SJVN Green Energy Limited (SGEL) which are material unlisted subsidiary of SJVN, incorporated in India, are also given along with Secretarial Audit Report of the Company.
26. STATUTORYAUDIT
M/s Charanjit Singh & Associates, Chartered Accountants, were appointed by Comptroller & Auditor General as Statutory Auditors of the Company for the financial year 2025-26.
The Report of the Statutory Auditors to the Members on the Standalone and Consolidated Accounts for the year ended 31.03.2026 is placed at Annexure-X and Annexure-XII respectively. Observations/ Comments of the Comptroller and Auditor General (C&AG) of India on the Standalone and Consolidated Accounts for the year ended 31.03.2026 are placed at Annexure-XI and Annexure-XIII respectively. Comments of C&AG being NIL the reply by the Board thereto is not applicable.
27. ANNUAL RETURN
The Draft Annual Return in Form MGT-7 as required under Section 92(3) of the Companies Act, 2013 can be accessed at Investor Relation Section on SJVN website https://sjvn.nic.in/.
28. COST RECORDS AND AUDIT
Pursuant to the Central Government directions to audit Cost Accounting Records as maintained by the Company, your Company appointed M/s Balwinder & Associates, Cost
Accountants, as Cost Auditor for the financial year 2025-26. The Cost Audit Report for the year ended 31st March 2025 was filed with MCA on 27.09.2025.
29. INTERNAL FINANCIAL CONTROL SYSTEM
Internal controls are the mechanisms, rules, and procedures implemented by a company to ensure the integrity of financial and accounting information, promote accountability and prevent fraud. Financial controls are processes, policies, and procedures that are implemented to manage finances.
The company has adequate internal control system and the transactions/ processes are guided by delegation of powers, policies, rules, guidelines and manuals framed in compliance with relevant laws and regulations. The organizational structure is well defined in terms of structured authority/ responsibility involved at each particular hierarchy/level.
The company has sufficient internal control over financial reporting to ensure assurance regarding the reliability of financial reporting and in the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.
In order to ensure adequacy of internal control system, internal audit is conducted by the independent Chartered Accountants firms in close co-ordination with company's own internal Audit Department. The internal Audit process includes review and evaluation of effectiveness of existing processes, controls and compliances. It also ensures adherence to rules, procedures, policies and systems and mitigation of the operational risks perceived for each area under audit.
It is also informed that significant Audit observations and Action Taken reports are placed before the Audit Committee headed by Independent Directors. The recommendation and directions of the Audit Committee are carried out and complied with.
30. RELATED PARTY TRANSACTIONS & POLICY
In compliance with the provisions of Regulation 23 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 and Section 188 of Companies Act 2013, the company has formulated a Policy on Materiality of Related Party Transactions and dealing with Related Party T ransaction, duly approved by the Board of Directors.
All contracts/ arrangements/ transactions entered by the company during the financial year with related parties were in the ordinary course of business and on arm’s length basis. During the year, the company had not entered into any contract/ arrangement/ transaction with related parties, which could be considered material in accordance with the policy of the company on materiality of related party transactions or provisions of SEBI (LODR) Regulations, 2015. Your attention is drawn to the Financial Statements, which sets out the Related Party Disclosures under Note no. 2.46.
The Policy on Materiality of Related Party Transactions and dealing with Related Party Transaction has been disclosed on website of the Company and may be accessed at https://sjvn.nic.in/sites/default/files/2025- 10/264031039_PageDocument_RPT_POLICY.pdf.
31. CONSOLIDATED FINANCIAL STATEMENTS
In accordance with the Indian Accounting Standard (Ind AS)-110 on Consolidated Financial Statements read with Ind AS-111 on Joint Agreements and Ind AS-112 on Disclosure of Interest in other entities, the Audited Consolidated Financial Statements are provided in the Annual Report. The audited financial statements of subsidiary companies in terms of Section 136 of the Companies Act, 2013, are placed on the website of the company i.e., https://sjvn.nic.in/en/Financial-Statements-of-Subsidiary-Companies-of-SJVN- Limited .
Statement containing salient features of the financial statements of Subsidiaries/ Joint Ventures of SJVN Ltd. pursuant to first proviso to sub-section (3) of Section 129 read with Rule 5 of Companies (Accounts) Rules, 2014, in form AOC-I forms part of the Consolidated Financial Statements.
32. DETAILS OF DIRECTORS OR KMPAPPOINTED/ RESIGNED
During the FY 2025-26, the following changes took place in the composition of the Board of Directors and KMP of the Company: -
1. Dr. Udeeta Tyagi was re-appointed as an Independent Director on the Board of the Company for a period of one-year w.e.f. 17.04.2025.
2. Shri Raj Kumar Chaudhary ceased to hold the additional charge of the post of Chairman and Managing Director of the Company on 30.04.2025 on account of his superannuation.
3. Shri Bhupender Gupta, Chairman and Managing Director, NHPC Limited, is entrusted with an additional charge of the post of the Chairman and Managing Director of the Company w.e.f. 01.05.2025.
4. Shri Sushil Sharma ceased as Director (Projects) of the Company on 31.07.2025 pursuant to completion of his tenure as Director (Projects).
5. Shri Sanjay Kumar ceased to be the Chief Financial Officer of the Company on account of his superannuation on 31.07.2025.
6. Shri Arindam Chaudhary ceased to be the Government of Himachal Pradesh Nominee Director on 01.08.2025 consequent to his transfer.
7. Shri Sipan Kumar Garg was entrusted with the additional charge of the post of Director (Finance) of the Company, w.e.f. 01.09.2025 vide Ministry of Power Order dated
29.08.2025. 01.12.2025 and 26.02.2026. He was also appointed as Chief Financial Officer of the Company w.e.f. 10.11.2025. Further, he ceased to be Director (Finance) and Chief Financial Officer of the Company on 19.03.2026 pursuant to appointment of regular incumbent to the post of Director (Finance).
8. Shri Rajendra Prasad Goyal ceased to hold the additional charge of the post of Director (Finance)of the Company on 31.08.2025.
9. Shri Shubh Karan Singh, Special Secretary (Power), Government of Himachal Pradesh has been appointed as Government of Himachal Pradesh Nominee Director on the Board of the Company w.e.f. 12.09.2025.
10. Dr. Shashikant Jagannath Wani ceased on account of completion of his tenure as Independent Director on 12.03.2026.
11. Shri Parthajit De has been appointed as Whole-time Director (Finance) on the Board of the Company for a period of five years w.e.f. the date of assumption of charge i.e.,
19.03.2026.
The following changes took place during the current financial year 2026-27 till the date of the Director’s Report:
1. Shri Parthajit De, Director (Finance) of the Company has been appointed as Chief Financial Officer of the Company w.e.f. 10.04.2026.
2. Dr. Udeeta Tyagi, ceased as Independent Director on the Board of the Company pursuant to completion of her tenure on April 16, 2026.
3. Shri Mohammad Afzal ceased as Government of India Nominee Director w.e.f.
30.04.2026 on account his joining as Joint Secretary (Ministry of Minority Affairs).
4. Shri Suprakash Adhikari, Director (Technical), NHPC Limited has been entrusted with the additional charge of Director (Projects) of SJVN Limited w.e.f. 01.08.2025, for a period of one year or till full-time incumbent is appointed or until further orders, whichever is earlier. Subsequently, he ceased to be the Director (Projects) of the Company w.e.f.
11.06.2026 pursuant to appointment of regular incumbent to the position of Director (Projects).
5. Shri Diwakar Nath Misra, Additional Secretary (Hydro), Ministry of Power, Government of India has been appointed as Government of India Nominee Director on the Board of the Company with effect from 14.05.2026.
6. Shri Rajesh Kumar Chandel has been appointed as Whole-time Director (Projects) on the Board of the Company for a period of five years w.e.f. the date of assumption of charge i.e., 11.06.2026.
7. Smt. Arti Kujur has been appointed as Part-time Non-Official Director (Independent Director) on the Board of the Company for a period of three years w.e.f. the date of notification i.e., 15.07.2026.
8. Shri Shubh Karan Singh ceased as Govt of Himachal Pradesh Nominee Director on
20.07.2026.
None of the Directors are inter-se related to each other.
The Board Meetings held during the Financial Year 2025-26 and the attendance of the Directors therein is mentioned in the Report on Corporate Governance.
33. BOARD LEVEL COMMITTEES
The composition of the Statutory Committees constituted as per the Companies Act 2013 and the SEBI Listing Regulations and the meetings held therein are mentioned in the Corporate Governance Report.
34. KEY MANAGERIAL PERSONNEL
In compliance with Section 203 of the Companies Act, 2013, presently following are the designated Key Managerial Personnel of the Company:-
1. Shri Bhupender Gupta, Chairman & Managing Director (Additional Charge);
2. Shri Ajay Kumar Sharma, Director (Personnel);
3. Shri Parthajit De, Director (Finance) cum Chief Financial Officer;
4. Shri Rajesh Kumar Chandel, Director (Projects);
5. Shri Soumendra Das, Company Secretary (CS).
35. IMPLEMENTATION OF OFFICIAL LANGUAGE
In order to ensure the implementation of the Official Language Policy of the Govt. of India, all possible efforts have been made by the company to achieve the targets as specified by the Department of Official Language.
Under section 3.3(i) of Official Language Act cent percent documents were issued bilingually & all the letters received in Hindi were replied to in Hindi. Company’s website is in bilingual form and it is updated from time to time.
To encourage executives and non-executives to do their entire work in Hindi, number of incentive schemes are under implementation namely Payment of increment of three months during the year, for doing his/her whole office work in Hindi and during the year and under this scheme a total 207 Employees/Officers were awarded cash prizes amounting to Rs.14,43,960/- (Approx.).
During the review year 17 Hindi workshops/seminars have been organised and 353 no. of executives and non-executives have been trained. Organising of Hindi quiz competitions on national/important occasions and other competitions (i.e. Nibhand (Essay writing), Chitra Adharit Kahani, Noting-drafting, Sulekh, Kavy Gosti, Rajbhasha Niti Prasnouttri Competition) is a regular feature and besides this number of competitions were also organised during “Hindi fortnight”. In these competitions 304 no. of employees were participated and awarded cash prizes amounting to 4,02,600/-
To popularise Hindi in a big way a ‘Rajbhasha Sangoshit’ was organised on 26.12.2025 at Corporate Headquarter, Shimla and at 'Kavya Ghosti' was organised on 23.09.2025 at Corporate Headquarter, Shimla.
SJVN has been conferred with "Rajbhasha Prabha (Shield) Puraskar” by the Ministry of Power for the excellent implementation of the Official Language Policy during the year 2023-24. This award was presented by Hon'ble Minister of Power and Housing & Urban Affairs, Sh. Manohar Lal to Chairman & Managing Director,SJVN, Shri Bhupendra Gupta, on June 19, 2025, during the Hindi Salahkar Samiti Baithak held in New Delhi. In addition, the corporation has been also awarded with "NARAKAS Protshan Puraskar" for its “Excellent” performance in the activities of NARAKAS (Karyalya-2) during the year 2024-25. This award was presented by Secretary, Department of Official Language, Smt. Anshuli Arya to Shri Ashish Pant, General Manager (Official Language) of the corporation on 15 September,2025.
The awards of TOLIC Rajbhasha Shield were given to the members of TOLIC, Shimla (Office- 2), on 08.12.2025 for the best performance in Official Language Hindi. Apart from this, the Corporation was awarded the first prize of NARAKAS Official Language Shield on 08.12.2025 by the Joint Director (Official Language), Department of Official Language, Ministry of Home Affairs, Government of India.
Half yearly meetings of the Town Official Language Implementation Committee, Shimla (Office-2) constituted for the CPSUs & Banks etc. were held on 30.07.2025 & 08.12.2025.
To give impetus to the multi-facet talent of employees an in-house bi-annual Hindi magazine "Himshakti " and on Annual basis issues of TOLIC in-house magazine 'Himsamvad' was published and circulated. During review year out of total expenditure on purchase of books, 90.46% of amount was spent on purchase of Hindi books.
36. AWARDS & ACHIEVEMENTS
1. 19th June 2025 : SJVN honored with Rajbhasha Prabha Award by MoP, GoI for excellent work in promotion of Official Language Policy in year 2023-24.
2. 29th August 2025 : SJVN conferred with SCOPE Eminence Award in Human Resource Management.
3. 29th September 2025 : SJVN awarded Second prize in prestigious Swachhta Pakhwada Awards 2025 by MoP, GoI.
4. 13th November 2025 : SJVN conferred with SHRM India HR Awards 2025 in Excellence in Managing Employees Performance category (First Runner up).
5. 27th February, 2026 : SJVN conferred with Swachhta Hi Sewa Pakhwada Awards 2024-25 (Third Prize) by MoP, GoI.
37. OTHER MAJOR DEVELOPMENTS
1. 22nd May 2025 : Hon’ble Prime Minister Sh. Narendra Modi virtually laid foundation stone of 100 MW Nawa Solar Power Project, Rajasthan.
2. 23rd May 2025 : SJVN signed Power Sale Agreement with DVC for supply of power from 900 MW Arun-III HEP.
3. 1st July 2025 : SJVN signed Power Sale Agreement for supply of power from 900 MW Arun-Ill HEP and Power Purchase Agreement for supply of power from 210 MW Luhri Stage-I HEP and 382 MW Sunni Dam HEP with UPPCL.
4. 1st July 2025 : SJVN signed Power Purchase Agreement with NDMC for supply of power from 382 MW Sunni Dam HEP at NDMC Headquarters New Delhi.
5. 20th September 2025 : Hon’ble Prime Minister Sh. Narendra Modi virtually laid foundation stone of 200 MW Solar Power Project (GUVNL Phase - XVII, Khavda Solar Park), Gujarat.
6. 14th November 2025 : SJVN successfully commissioned Unit-1 (660 MW) of the 1320 MW Buxar Thermal Power Project, Bihar.
7. 24th December 2025 : SJVN successfully commissioned the 1000 MW Bikaner Solar Power Project, Rajasthan.
8. 5th February, 2026 : SJVN signed a Contract Agreement amounting to Rs. 837.43 Crores with M/s BHEL for Electro-Mechanical Works of 382 MW Sunni Dam HEP, HP.
9. 5th February, 2026 : SJVN successfully commissioned the 70 MW Dhubri Solar Power Project, Assam.
10. 9th March, 2026 : SJVN’s 1500 MW Nathpa Jhakri Hydro Power Station achieved historic milestone of 150 billion units cumulative power generation.
38. PARTICULARS OF LOANS GIVEN, INVESTMENTS MADE GUARANTEES GIVEN AND SECURITIES PROVIDED UNDER SECTION 186 OF COMPANIES ACT, 2013
Particulars of loans given, investments made, guarantees given and securities provided along with the purpose for which the loan or guarantee or security is proposed to be utilized by the recipient are as under :-
|
Particulars
|
Details
|
|
Loans given
|
Refer Note 2.6 and 2.14 to standalone financial statements
|
|
Investments made
|
Refer Note 2.5 to standalone financial statements
|
|
Guarantees given
|
Refer Note 2.50
|
|
Securities provided
|
Nil
|
6. The company has not made any buyback of shares during the year under review.
7. There have been no changes in the nature of business of the company during the year.
8. No application was made or any proceeding was pending against SJVN Limited under the Insolvency and Bankruptcy Code, 2016 during the financial year 2025-26.
42. ACKNOWLEDGEMENT
The Board of Directors acknowledge with deep appreciation, the co-operation and guidance extended by various Ministries/Departments of the Government of India, particularly, Ministry of Power, Ministry of New & Renewable Energy, Ministry of Finance, Ministry of External Affairs, Ministry of Environment & Forest, Central Electricity Authority, Central Water Commission, Geological Survey of India, the Government of Nepal, the Government of Himachal Pradesh, State Governments of Bihar, Uttarakhand, Gujarat, Uttar Pradesh, Maharashtra, Assam, Arunachal Pradesh, Rajasthan, Punjab, Madhya Pradesh, the State Electricity Boards and the World Bank.
Your Directors also convey their gratitude to the shareholders, various international and Indian banks and financial institutions for the confidence reposed by them in the Company. The Board also acknowledges and appreciates the contribution made by Contractors, Vendors, Consultants and others for achieving the planned goals of the Company.
The Board also places on record its deep appreciation of valued cooperation extended by the Office of the Comptroller and Auditor General of India and the Auditors. Last but not least, the Board commends the hard work and dedicated efforts put in by the employees of the Corporation including the employees on deputation at all levels.
For and on behalf of Board of Directors
Sd/-
(Bhupender Gupta) Chairman & Managing Director DIN: 06940941
Date: 31.07.2026 Place: New Delhi39. DETAILS OF NON-CONVERTIBLE SECURITIES ISSUED
In FY 2021-22 Company has raised the fund of Rs. 1000 Cr. through private placement of Non¬ Convertible, Redeemable Debenture at a coupon rate of 6.10% p.a having maturity at 5-year tenor. No new NCD was raised in the FY 2025-26.
40. DETAILS OF EXTERNAL COMMERCIAL BORROWINGS (ECB)
SJVN has tied up USD 500 Million from PNB Dubai/Gift City in FY 2021-2022 and subsequently revised the sanction to USD 300 Million and the same has been disbursed and utilised towards capital expenditure in the ongoing projects. The total outstanding borrowings of PNB Gift City was '2839.50 Crores as on 31.03.2026 (Previous year ' 2578.50 Crores).
SJVN has also tied-up the ECB amounting to JPY 15 Billion. The entire ECB has been utilized to meet out the Capital Expenditure of 100 MW Raghanesda Solar Power Project in the state of Gujarat and 90 MW Omkareshwar Floating Solar Power Project in the state of Madhya Pradesh, executed by SJVN Green Energy Limited (Wholly Owned Subsidiary of SJVN Ltd). The Total Outstanding Borrowings of ECB-JBIC was '758.17 Crores as on 31.03.2026 (Previous Year '816.22 Crores).
The Outstanding foreign currency loan from World Bank for Financing RHPS was '708.98 Crores as on 31.03.2026 (Previous Year ' 939.32 Cr).
41. GENERAL
Directors of your Company state that no disclosure or reporting is required in respect of the following items as there were no transactions/ events on these items/ matters during the year under review:
1. The Company has not accepted any deposits during the year under review.
2. Issue of equity shares with differential rights as to dividend, voting or otherwise.
3. Neither the Managing Director nor the Whole-time Directors of the Company receive any remuneration or commission from any of its subsidiaries.
4. No significant or material orders were passed by the Regulators or Courts or Tribunals which impact the going concern status and Company’s operations in future.
5. There have been no Material Changes and Commitments affecting the financial position of the company which have occurred between the end of the financial year 2025-26 and the date of this report.
|